Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has a risk assessment and method statement been prepared
-
Is area prepared for this element / builders work complete
-
Agree setting out points: provide datum marks
-
Check that structural steelwork contact surfaces are isolated from aluminium products
-
Agree protection of fixed materials for as long as possible
-
Check alignment of mullions and transoms as work proceeds
-
Check method of fixing curtain wall frame work to the structure
-
Check the methods used to seal the ends of mullions and transoms
-
Check that the subcontractor is using the correct fixings and are material compatible
-
Check that all DPMs are in place at junctions in the structure
-
Check DPMs and methods of jointing and sealing at parapet cappings and continuous cills
-
Ensure that glass is packed clear of window frame sections on all edges
-
Check all sealant pointing
-
Check the fitting of all glazing gaskets for clean, secure fit
-
Check window and door operation
-
Check that any solid panels have all round clearance and that they are securely fitted
-
Check spigot connections for a good seal and that they will permit thermal movement
-
Check for surface damage to all components
-
Check that rain outlet points in the glazing system are clear of debris and sealant
-
Instruct the subcontractor to clean all the surfaces prior to Clerk of Works inspection