Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has a method statement and risk assessment been prepared
-
Has a sample room/area been produced and approved
-
Has surplus plaster been removed from timber surfaces
-
Check that plaster is dry
-
Ensure good lighting is provided and maintained
-
Check painter protects other works as necessary
-
Check alignment of skirting with walls, action any filling
-
Ensure all knots in timber are sealed
-
Ensure mist coat is applied to walls to highlight any imperfections
-
Ensure specified filler and paint is being used
-
Check cutting in to ceiling and wall abutments
-
Check cutting in to back moulds where they abut plaster
-
Check around all switch plates and sockets
-
Check inside kitchen units for painted surfaces
-
Check glazing and fittings for paint splashes, runs and over painting
-
Check back and undersides of pipework and behind radiators
-
Have the tops of doors and back moulds been painted
-
Is paint being allowed to dry between coats
-
Check finish and cover of all painted surfaces
-
Has the area been left clean and secure