Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

PROJECT:

  • Project

  • Location on site

  • Client

  • Client representative

VERIFICATION

  • Construction drawings approved for use

  • DRWG No

  • REV No

Services have been identified

  • 2. Services have been identified

  • Notification of service disruptions are in place

SERVICES TO BE DISCONNECTED

  • Potable cold water service

  • Hot water service

  • Warm water service

  • Hot water return

  • Fire hydrant service

  • Fire hose reel service

  • Gas service

  • Sanitary drainage service

  • Trade waste service

  • Stormwater service

Existing pipework

  • Live pipe work protected and clearly marked

  • redundant pipe work removed from area

  • In ground drainage capped in ground

  • In ground drainage capped at floor level

SIGNATURE: DATE:

  • CHECKED BY:

  • REVIEWED BY

  • DATE:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.