Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Cintellate Incident Number:

1. Notification Owner Details

  • Select date

  • Reported to (LCPL Staff only):

  • Reported by:

  • Job Title (if not LCPL):

  • Non Employee type (if not LCPL):

  • Company Name (if not LCPL):

  • Incident Date/Time:

  • Responsible Entity/Project Site:

  • Area:

2. Notification Details

  • Exact Location:

  • Incident Summary (brief):

  • What happened?

  • What could have happened?

  • Explain what could have happened?

  • Activity:

  • Essentials Category:

  • High Risk Activity?

  • ARM Reference Number:

  • Responsible Supervisor:

  • Send Incident Alert?

  • Is this a work related incident?

  • Justification if not work related:

  • Immediate actions taken: ( detail of actions, completed by & completion date)

3. Incident Type/ Consequence

    Personal Damage Near Miss

4. Incident consequence specific details

4.1 Personal damage actual or near miss

  • Details of Injured Person:

  • Name:

  • Department:

  • Job Title/ Occupation:

  • Employment Type:

  • Company Name:

  • Summary of Injury/ Illness:

  • Additional injury details:

  • Initial treatment:

  • Injury Type and Classification

  • Where did the injury occur:

  • Severity of Injury:

  • Actual

  • Class 1: Fatal or Permanent damage to a person(s)

  • Class 2: Lost time or Restricted work injury, Medically treated

  • Class 3: First Aid or Minor injury

  • Potential

  • Potential Class 1: Any injury that has potential to result in Class 1 damage

  • Potential Class 2: Any injury that has the potential to result in Class 2 damage

  • Potential Class 3: Any incident that has the potential to result in Class 3 damage

  • Details of Injury/ Illness

  • Shift / Working hours details:

  • Type of employment

  • Shift start time

  • Roster Arrangement

  • Consecutive days worked:

  • Average daily hours:

  • Proportion shift worked:

  • Workers experience in task (in months):

  • Date of return to full duties:

  • Comments:

  • Hours awake:

  • Sleep opportunities

  • Hours of sleep in the last 24 hours:

  • Hours of sleep within 24 to 48 hours:

4.1a Plant / Equipment Damage or Failure

  • Damage

  • Failure

  • Mobile

  • Fixed

  • Plant Equipment Type:

  • Damage Details:

  • Estimated Value:

  • Damaged / Failed Equiment

  • Equipment
  • Type/Model:

  • Year:

  • Serial No:

  • Owner Details:

  • Registration Number:

  • Asset Number:

  • Plant/Equipment:

  • Total Value of Plant/Equipment($):

  • Actual Cost of Damage ($):

  • Personal Damage Actual

4.1 Personal damage actual or near miss

  • Details of Injured Person:

  • Name:

  • Department:

  • Job Title/ Occupation:

  • Employment Type:

  • Company Name:

  • Summary of Injury/ Illness:

  • Additional injury details:

  • Initial treatment:

  • Injury Type and Classification

  • Where did the injury occur:

  • Severity of Injury:

  • Actual

  • Class 1: Fatal or Permanent damage to a person(s)

  • Class 2: Lost time or Restricted work injury, Medically treated

  • Class 3: First Aid or Minor injury

  • Potential

  • Potential Class 1: Any injury that has potential to result in Class 1 damage

  • Potential Class 2: Any injury that has the potential to result in Class 2 damage

  • Potential Class 3: Any incident that has the potential to result in Class 3 damage

  • Details of Injury/ Illness

  • Shift / Working hours details:

  • Type of employment

  • Shift start time

  • Roster Arrangement

  • Consecutive days worked:

  • Average daily hours:

  • Proportion shift worked:

  • Workers experience in task (in months):

  • Date of return to full duties:

  • Comments:

  • Hours awake:

  • Sleep opportunities

  • Hours of sleep in the last 24 hours:

  • Hours of sleep within 24 to 48 hours:

4.1a Plant / Equipment Damage or Failure

  • Damage

  • Failure

  • Mobile

  • Fixed

  • Plant Equipment Type:

  • Damage Details:

  • Estimated Value:

  • Damaged / Failed Equipment

  • Equipment
  • Type/Model:

  • Year:

  • Serial No:

  • Owner Details:

  • Registration Number:

  • Asset Number:

  • Plant/Equipment:

  • Total Value of Plant/Equipment($):

  • Actual Cost of Damage ($):

  • Environmental Damage Near Miss

4.2 Environmental Damage Actual or Near Miss

  • Environmental Details

  • Impact Loss / Type

  • Details of Environmental Impact:

  • Estimated Damage/Repair Cost ($):

  • Was this a compliant?

  • Actual

  • Level 1: Extreme incident, where impact is irreversible or reversible but material to LCPL

  • Level 2: Serious incident, where impact is reversible but costly

  • Level 3: Minor incident that have a short term and reversible impact on the environment

  • Potential

  • Potential Level 1: Any injury that has potential to result in Level 1 damage

  • Potential Level 2: Any injury that has the potential to result in Level 2 damage

  • Potential Level 3: Any incident that has the potential to result in Level 3 damage

  • HER- Aboriginal and European Culture Heritage Details

  • Indigenous

  • Non-Indigenous

  • Incident Type:

  • Cultural/Archaeological Site Name:

  • Known Site

  • Unknown Site

  • Site Type:

  • Other Site Type:

  • Size of Impact Area:

  • Unit:

  • CON- Contamination to Land & Groundwater Details

  • Contaminant:

  • Land Type:

  • Volume Released:

  • Unit:

  • Volume Recovered:

  • Unit:

  • Size of Impact Area:

  • Unit:

  • Distance to Sensitive Area:

  • Unit:

  • WAT- Discharge to Surface Waters Details

  • Contaminant:

  • Volume Released:

  • Unit:

  • Distance to Sensitive Area:

  • Unit:

  • FF- Flora and Fauna Details

  • Significance:

  • Fauna

  • Flora

  • Cause of Death:

  • Other Cause of Death:

  • Species Type:

  • Population/ Size Affected:

  • Unit:

  • AIR- Dust, Odour & Emissions

  • Emission Source:

  • Other Source Type:

  • Release Amount:

  • Unit:

  • Release Duration (hours):

  • Report Trigger:

  • Other, please specify:

  • Cause:

  • Did this result from unauthorized use?

  • NVL- Noise and Vibration Details

  • Noise Source:

  • Other Source Type:

  • Noise Limit Exceeded by (dB):

  • Was this out of approved operational hours?

  • Vibration Source:

  • Was this out of approved operational hours?

  • WAS- Waste (Solids, Liquids, Hazardous and Non- harzardous)

  • Solid

  • Liquid

  • Waste Type:

  • Other Waste Type:

  • Unauthorised Disposal Location:

  • Estimated Quantity:

  • Unit:

  • Cause:

  • Able to Recover Waste?

  • RES- Impact on Availability of Resources Details

  • Unauthorised Discharge Details

  • Water Source:

  • Other Source Type:

  • Volume:

  • Unit:

  • Water Quality:

  • Ground Water license Limit Exceeded:

  • Unauthorised Land / Fuel / Waste Details

  • Describe the Unauthorised Use:

  • Quantity Used/Affected:

  • Unit:

  • Cause:

  • ESC- Erosion & Sediment Details

  • Overflow

  • Discharge

  • Off-Site

  • On-Site

  • Water Quality:

  • Volume Released:

  • Unit:

  • Volume Recovered:

  • Unit:

  • Receiving Environment:

  • Distance to Sensitive Area (Meters):

  • ASS- Acid Sulphate Soils

  • Overflow

  • Discharge

  • Off-Site

  • On-Site

  • Water Quality:

  • Volume Released:

  • Unit:

  • Volume Recovered:

  • Unit:

  • Receiving Environment:

  • Distance to Sensitive Area (Meters):

  • DMR- Dirt and Mud on Public Roads

  • Off-Site

  • On-Site

  • Nature of Material:

  • Area Impacted:

  • Unit:

  • Area Remediated:

  • Unit:

  • Receiving Environment:

  • Distance to Sensitive Area (Meters):

  • Environmental Damage Actual

  • Environment damage actual

4.2 Environmental Damage Actual or Near Miss

  • Environmental Details

  • Impact Loss / Type

  • Details of Environmental Impact:

  • Estimated Damage/Repair Cost ($):

  • Was this a compliant?

  • Actual

  • Level 1: Extreme incident, where impact is irreversible or reversible but material to LCPL

  • Level 2: Serious incident, where impact is reversible but costly

  • Level 3: Minor incident that have a short term and reversible impact on the environment

  • Potential

  • Potential Level 1: Any injury that has potential to result in Level 1 damage

  • Potential Level 2: Any injury that has the potential to result in Level 2 damage

  • Potential Level 3: Any incident that has the potential to result in Level 3 damage

  • HER- Aboriginal and European Culture Heritage Details

  • Indigenous

  • Non-Indigenous

  • Incident Type:

  • Cultural/Archaeological Site Name:

  • Known Site

  • Unknown Site

  • Site Type:

  • Other Site Type:

  • Size of Impact Area:

  • Unit:

  • CON- Contamination to Land & Groundwater Details

  • Contaminant:

  • Land Type:

  • Volume Released:

  • Unit:

  • Volume Recovered:

  • Unit:

  • Size of Impact Area:

  • Unit:

  • Distance to Sensitive Area:

  • Unit:

  • WAT- Discharge to Surface Waters Details

  • Contaminant:

  • Volume Released:

  • Unit:

  • Distance to Sensitive Area:

  • Unit:

  • FF- Flora and Fauna Details

  • Significance:

  • Fauna

  • Flora

  • Cause of Death:

  • Other Cause of Death:

  • Species Type:

  • Population/ Size Affected:

  • Unit:

  • AIR- Dust, Odour & Emissions

  • Emission Source:

  • Other Source Type:

  • Release Amount:

  • Unit:

  • Release Duration (hours):

  • Report Trigger:

  • Other, please specify:

  • Cause:

  • Did this result from unauthorized use?

  • NVL- Noise and Vibration Details

  • Noise Source:

  • Other Source Type:

  • Noise Limit Exceeded by (dB):

  • Was this out of approved operational hours?

  • Vibration Source:

  • Was this out of approved operational hours?

  • WAS- Waste (Solids, Liquids, Hazardous and Non- harzardous)

  • Solid

  • Liquid

  • Waste Type:

  • Other Waste Type:

  • Unauthorised Disposal Location:

  • Estimated Quantity:

  • Unit:

  • Cause:

  • Able to Recover Waste?

  • RES- Impact on Availability of Resources Details

  • Unauthorised Discharge Details

  • Water Source:

  • Other Source Type:

  • Volume:

  • Unit:

  • Water Quality:

  • Ground Water license Limit Exceeded:

  • Unauthorised Land / Fuel / Waste Details

  • Describe the Unauthorised Use:

  • Quantity Used/Affected:

  • Unit:

  • Cause:

  • ESC- Erosion & Sediment Details

  • Overflow

  • Discharge

  • Off-Site

  • On-Site

  • Water Quality:

  • Volume Released:

  • Unit:

  • Volume Recovered:

  • Unit:

  • Receiving Environment:

  • Distance to Sensitive Area (Meters):

  • ASS- Acid Sulphate Soils

  • Overflow

  • Discharge

  • Off-Site

  • On-Site

  • Water Quality:

  • Volume Released:

  • Unit:

  • Volume Recovered:

  • Unit:

  • Receiving Environment:

  • Distance to Sensitive Area (Meters):

  • DMR- Dirt and Mud on Public Roads

  • Off-Site

  • On-Site

  • Nature of Material:

  • Area Impacted:

  • Unit:

  • Area Remediated:

  • Unit:

  • Receiving Environment:

  • Distance to Sensitive Area (Meters):

  • Non SHE Event Only (Operational)

  • Non SHE Event Only

4.3 Non SHE Event Only (Operational)

  • Select date

  • Reference Number:

  • Notified to (LCPL Staff only):

  • Notified By:

  • Job Title (if not LCPL):

  • Non Employee type:

  • Company Name:

  • Detailed justification as to why no potential risk is perceived to have occurred:

  • Non SHE Event Type:

  • Other, please specify:

  • Damage Details:

  • Mobile

  • Fixed

  • Estimated Value:

  • Serial Number:

  • Plant/Vehicle Operator:

  • Registration Number:

  • Asset Number:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.