Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Cintellate Incident Number:
1. Notification Owner Details
-
Select date
-
Reported to (LCPL Staff only):
-
Reported by:
-
Job Title (if not LCPL):
-
Non Employee type (if not LCPL):
-
Company Name (if not LCPL):
-
Incident Date/Time:
-
Responsible Entity/Project Site:
-
Area:
2. Notification Details
-
Exact Location:
-
Incident Summary (brief):
-
What happened?
-
What could have happened?
-
Explain what could have happened?
-
Activity:
-
Essentials Category:
-
High Risk Activity?
-
ARM Reference Number:
-
Responsible Supervisor:
-
Send Incident Alert?
-
Is this a work related incident?
-
Justification if not work related:
- community injury
- member of public
- exposure/ event outside work environment
- voluntary/ non-work participant/activity
- personal tasks outside of assigned workers
- non-communicable disease/illness
- non-work related mental/ psychological illness
- other
-
Immediate actions taken: ( detail of actions, completed by & completion date)
3. Incident Type/ Consequence
-
Personal Damage Near Miss
4. Incident consequence specific details
4.1 Personal damage actual or near miss
-
Details of Injured Person:
-
Name:
-
Department:
-
Job Title/ Occupation:
-
Employment Type:
-
Company Name:
-
Summary of Injury/ Illness:
-
Additional injury details:
-
Initial treatment:
-
Injury Type and Classification
-
Where did the injury occur:
-
Severity of Injury:
- Fatality
- LTI
- RWI
- MTI
- FAI
- Minor
-
Actual
-
Class 1: Fatal or Permanent damage to a person(s)
-
Class 2: Lost time or Restricted work injury, Medically treated
-
Class 3: First Aid or Minor injury
-
Potential
-
Potential Class 1: Any injury that has potential to result in Class 1 damage
-
Potential Class 2: Any injury that has the potential to result in Class 2 damage
-
Potential Class 3: Any incident that has the potential to result in Class 3 damage
-
Details of Injury/ Illness
-
Shift / Working hours details:
-
Type of employment
-
Shift start time
-
Roster Arrangement
-
Consecutive days worked:
-
Average daily hours:
-
Proportion shift worked:
-
Workers experience in task (in months):
-
Date of return to full duties:
-
Comments:
-
Hours awake:
-
Sleep opportunities
-
Hours of sleep in the last 24 hours:
- 1 hour
- 2 hours
- 3 hours
- 4 hours
- 5 hours
- 6 hours
- 7 hours
- 8 hours or more
-
Hours of sleep within 24 to 48 hours:
- 1 hour
- 2 hours
- 3 hours
- 4 hours
- 5 hours
- 6 hours
- 7 hours
- 8 hours or more
4.1a Plant / Equipment Damage or Failure
-
Damage
-
Failure
-
Mobile
-
Fixed
-
Plant Equipment Type:
-
Damage Details:
-
Estimated Value:
-
Damaged / Failed Equiment
Equipment
-
Type/Model:
-
Year:
-
Serial No:
-
Owner Details:
-
Registration Number:
-
Asset Number:
-
Plant/Equipment:
-
Total Value of Plant/Equipment($):
-
Actual Cost of Damage ($):
Personal Damage Actual
4.1 Personal damage actual or near miss
-
Details of Injured Person:
-
Name:
-
Department:
-
Job Title/ Occupation:
-
Employment Type:
-
Company Name:
-
Summary of Injury/ Illness:
-
Additional injury details:
-
Initial treatment:
-
Injury Type and Classification
-
Where did the injury occur:
-
Severity of Injury:
- Fatality
- LTI
- RWI
- MTI
- FAI
- Minor
-
Actual
-
Class 1: Fatal or Permanent damage to a person(s)
-
Class 2: Lost time or Restricted work injury, Medically treated
-
Class 3: First Aid or Minor injury
-
Potential
-
Potential Class 1: Any injury that has potential to result in Class 1 damage
-
Potential Class 2: Any injury that has the potential to result in Class 2 damage
-
Potential Class 3: Any incident that has the potential to result in Class 3 damage
-
Details of Injury/ Illness
-
Shift / Working hours details:
-
Type of employment
-
Shift start time
-
Roster Arrangement
-
Consecutive days worked:
-
Average daily hours:
-
Proportion shift worked:
-
Workers experience in task (in months):
-
Date of return to full duties:
-
Comments:
-
Hours awake:
-
Sleep opportunities
-
Hours of sleep in the last 24 hours:
- 1 hour
- 2 hours
- 3 hours
- 4 hours
- 5 hours
- 6 hours
- 7 hours
- 8 hours or more
-
Hours of sleep within 24 to 48 hours:
- 1 hour
- 2 hours
- 3 hours
- 4 hours
- 5 hours
- 6 hours
- 7 hours
- 8 hours or more
4.1a Plant / Equipment Damage or Failure
-
Damage
-
Failure
-
Mobile
-
Fixed
-
Plant Equipment Type:
-
Damage Details:
-
Estimated Value:
-
Damaged / Failed Equipment
Equipment
-
Type/Model:
-
Year:
-
Serial No:
-
Owner Details:
-
Registration Number:
-
Asset Number:
-
Plant/Equipment:
-
Total Value of Plant/Equipment($):
-
Actual Cost of Damage ($):
Environmental Damage Near Miss
4.2 Environmental Damage Actual or Near Miss
-
Environmental Details
-
Impact Loss / Type
- HER- Aboriginal and European Culture Heritage
- CON- Contamination to Land & Groundwater
- WAT- Discharge to Surface Waters
- FF- Flora and Fauna
- AIR- Dust, Odour & Emissions
- NVL- Noise and Vibration
- WAS- Waste (Solids, Liquids, Hazardous and non-hazardous)
- RES- Imact on Availablility of Resources
- ESC- Erosion and Sediment
- ASS- Acids Sulphates Soils
- DMR- Dirt and Mud on Public Roads
-
Details of Environmental Impact:
-
Estimated Damage/Repair Cost ($):
-
Was this a compliant?
-
Actual
-
Level 1: Extreme incident, where impact is irreversible or reversible but material to LCPL
-
Level 2: Serious incident, where impact is reversible but costly
-
Level 3: Minor incident that have a short term and reversible impact on the environment
-
Potential
-
Potential Level 1: Any injury that has potential to result in Level 1 damage
-
Potential Level 2: Any injury that has the potential to result in Level 2 damage
-
Potential Level 3: Any incident that has the potential to result in Level 3 damage
-
HER- Aboriginal and European Culture Heritage Details
-
Indigenous
-
Non-Indigenous
-
Incident Type:
-
Cultural/Archaeological Site Name:
-
Known Site
-
Unknown Site
-
Site Type:
- Archaeological Sites
- Buildings
- Burials
- Campsite (shell scatters)
- Cemeteries
- Dwellings
- Gardens
- Human Remains
- Landscapes
- Rock Art
- Scar Tree
- Stone Arrangement
- Structures
-
Other Site Type:
-
Size of Impact Area:
-
Unit:
-
CON- Contamination to Land & Groundwater Details
-
Contaminant:
-
Land Type:
-
Volume Released:
-
Unit:
-
Volume Recovered:
-
Unit:
-
Size of Impact Area:
-
Unit:
-
Distance to Sensitive Area:
-
Unit:
-
WAT- Discharge to Surface Waters Details
-
Contaminant:
-
Volume Released:
-
Unit:
-
Distance to Sensitive Area:
-
Unit:
-
FF- Flora and Fauna Details
-
Significance:
- Endangered Species
- Introduced Species
- Native Species
- Priority Species
- Threatened Habitat
- Threatened Species
-
Fauna
-
Flora
-
Cause of Death:
- Blasting
- Clearing and Grubbing
- Entrapment
- Fire
- Natural
- Poison
- Road Kill
-
Other Cause of Death:
-
Species Type:
-
Population/ Size Affected:
-
Unit:
-
AIR- Dust, Odour & Emissions
-
Emission Source:
- Dust
- Fire
- Generator
- Odour
- Refrigerant Gas
- Vehicle Emissions
-
Other Source Type:
-
Release Amount:
-
Unit:
-
Release Duration (hours):
-
Report Trigger:
-
Other, please specify:
-
Cause:
-
Did this result from unauthorized use?
-
NVL- Noise and Vibration Details
-
Noise Source:
- Blasting
- Excavation
- Fixed Plant
- Mobile Equipment
- Piling
- Tunnelling
-
Other Source Type:
-
Noise Limit Exceeded by (dB):
-
Was this out of approved operational hours?
-
Vibration Source:
-
Was this out of approved operational hours?
-
WAS- Waste (Solids, Liquids, Hazardous and Non- harzardous)
-
Solid
-
Liquid
-
Waste Type:
- Asbestos
- Biological
- Construction/Demolition
- Green Waste
- Hazardous Substance
- Hydrocarbon Contamination
-
Other Waste Type:
-
Unauthorised Disposal Location:
-
Estimated Quantity:
-
Unit:
-
Cause:
-
Able to Recover Waste?
-
RES- Impact on Availability of Resources Details
-
Unauthorised Discharge Details
-
Water Source:
-
Other Source Type:
-
Volume:
-
Unit:
-
Water Quality:
- TSS > Threshold
- Hyper Saline
- Portable
- Saline
- Hydrocarbon Contaminated
- Turbidity
-
Ground Water license Limit Exceeded:
-
Unauthorised Land / Fuel / Waste Details
-
Describe the Unauthorised Use:
-
Quantity Used/Affected:
-
Unit:
-
Cause:
-
ESC- Erosion & Sediment Details
-
Overflow
-
Discharge
-
Off-Site
-
On-Site
-
Water Quality:
- TSS > Threshold
- Hyper Saline
- Portable
- Saline
- Hydrocarbon Contaminated
- Turbidity
-
Volume Released:
-
Unit:
-
Volume Recovered:
-
Unit:
-
Receiving Environment:
-
Distance to Sensitive Area (Meters):
-
ASS- Acid Sulphate Soils
-
Overflow
-
Discharge
-
Off-Site
-
On-Site
-
Water Quality:
-
Volume Released:
-
Unit:
-
Volume Recovered:
-
Unit:
-
Receiving Environment:
-
Distance to Sensitive Area (Meters):
-
DMR- Dirt and Mud on Public Roads
-
Off-Site
-
On-Site
-
Nature of Material:
-
Area Impacted:
-
Unit:
-
Area Remediated:
-
Unit:
-
Receiving Environment:
-
Distance to Sensitive Area (Meters):
-
Environmental Damage Actual
Environment damage actual
4.2 Environmental Damage Actual or Near Miss
-
Environmental Details
-
Impact Loss / Type
- HER- Aboriginal and European Culture Heritage
- CON- Contamination to Land & Groundwater
- WAT- Discharge to Surface Waters
- FF- Flora and Fauna
- AIR- Dust, Odour & Emissions
- NVL- Noise and Vibration
- WAS- Waste (Solids, Liquids, Hazardous and non-hazardous)
- RES- Imact on Availablility of Resources
- ESC- Erosion and Sediment
- ASS- Acids Sulphates Soils
- DMR- Dirt and Mud on Public Roads
-
Details of Environmental Impact:
-
Estimated Damage/Repair Cost ($):
-
Was this a compliant?
-
Actual
-
Level 1: Extreme incident, where impact is irreversible or reversible but material to LCPL
-
Level 2: Serious incident, where impact is reversible but costly
-
Level 3: Minor incident that have a short term and reversible impact on the environment
-
Potential
-
Potential Level 1: Any injury that has potential to result in Level 1 damage
-
Potential Level 2: Any injury that has the potential to result in Level 2 damage
-
Potential Level 3: Any incident that has the potential to result in Level 3 damage
-
HER- Aboriginal and European Culture Heritage Details
-
Indigenous
-
Non-Indigenous
-
Incident Type:
-
Cultural/Archaeological Site Name:
-
Known Site
-
Unknown Site
-
Site Type:
- Archaeological Sites
- Buildings
- Burials
- Campsite (shell scatters)
- Cemeteries
- Dwellings
- Gardens
- Human Remains
- Landscapes
- Rock Art
- Scar Tree
- Stone Arrangement
- Structures
-
Other Site Type:
-
Size of Impact Area:
-
Unit:
-
CON- Contamination to Land & Groundwater Details
-
Contaminant:
-
Land Type:
-
Volume Released:
-
Unit:
-
Volume Recovered:
-
Unit:
-
Size of Impact Area:
-
Unit:
-
Distance to Sensitive Area:
-
Unit:
-
WAT- Discharge to Surface Waters Details
-
Contaminant:
-
Volume Released:
-
Unit:
-
Distance to Sensitive Area:
-
Unit:
-
FF- Flora and Fauna Details
-
Significance:
- Endangered Species
- Introduced Species
- Native Species
- Priority Species
- Threatened Habitat
- Threatened Species
-
Fauna
-
Flora
-
Cause of Death:
- Blasting
- Clearing and Grubbing
- Entrapment
- Fire
- Natural
- Poison
- Road Kill
-
Other Cause of Death:
-
Species Type:
-
Population/ Size Affected:
-
Unit:
-
AIR- Dust, Odour & Emissions
-
Emission Source:
- Dust
- Fire
- Generator
- Odour
- Refrigerant Gas
- Vehicle Emissions
-
Other Source Type:
-
Release Amount:
-
Unit:
-
Release Duration (hours):
-
Report Trigger:
-
Other, please specify:
-
Cause:
-
Did this result from unauthorized use?
-
NVL- Noise and Vibration Details
-
Noise Source:
- Blasting
- Excavation
- Fixed Plant
- Mobile Equipment
- Piling
- Tunnelling
-
Other Source Type:
-
Noise Limit Exceeded by (dB):
-
Was this out of approved operational hours?
-
Vibration Source:
-
Was this out of approved operational hours?
-
WAS- Waste (Solids, Liquids, Hazardous and Non- harzardous)
-
Solid
-
Liquid
-
Waste Type:
- Asbestos
- Biological
- Construction/Demolition
- Green Waste
- Hazardous Substance
- Hydrocarbon Contamination
-
Other Waste Type:
-
Unauthorised Disposal Location:
-
Estimated Quantity:
-
Unit:
-
Cause:
-
Able to Recover Waste?
-
RES- Impact on Availability of Resources Details
-
Unauthorised Discharge Details
-
Water Source:
-
Other Source Type:
-
Volume:
-
Unit:
-
Water Quality:
- TSS > Threshold
- Hyper Saline
- Portable
- Saline
- Hydrocarbon Contaminated
- Turbidity
-
Ground Water license Limit Exceeded:
-
Unauthorised Land / Fuel / Waste Details
-
Describe the Unauthorised Use:
-
Quantity Used/Affected:
-
Unit:
-
Cause:
-
ESC- Erosion & Sediment Details
-
Overflow
-
Discharge
-
Off-Site
-
On-Site
-
Water Quality:
- TSS > Threshold
- Hyper Saline
- Portable
- Saline
- Hydrocarbon Contaminated
- Turbidity
-
Volume Released:
-
Unit:
-
Volume Recovered:
-
Unit:
-
Receiving Environment:
-
Distance to Sensitive Area (Meters):
-
ASS- Acid Sulphate Soils
-
Overflow
-
Discharge
-
Off-Site
-
On-Site
-
Water Quality:
-
Volume Released:
-
Unit:
-
Volume Recovered:
-
Unit:
-
Receiving Environment:
-
Distance to Sensitive Area (Meters):
-
DMR- Dirt and Mud on Public Roads
-
Off-Site
-
On-Site
-
Nature of Material:
-
Area Impacted:
-
Unit:
-
Area Remediated:
-
Unit:
-
Receiving Environment:
-
Distance to Sensitive Area (Meters):
-
Non SHE Event Only (Operational)
Non SHE Event Only
4.3 Non SHE Event Only (Operational)
-
Select date
-
Reference Number:
-
Notified to (LCPL Staff only):
-
Notified By:
-
Job Title (if not LCPL):
-
Non Employee type:
-
Company Name:
-
Detailed justification as to why no potential risk is perceived to have occurred:
-
Non SHE Event Type:
- Company Reputation
- Criminal Behavior/Security
- Operational Delay
- Non LCPL related Event/condition
- Non loss of control - non hazardous service contact
- Process/Production Loss
- Plant/Equipment Damage
- Plant/Equipment Failure
- Property Damage by Weater / Nature / Environmental Conditions
- Social Responsibility
-
Other, please specify:
-
Damage Details:
-
Mobile
-
Fixed
-
Estimated Value:
-
Serial Number:
-
Plant/Vehicle Operator:
-
Registration Number:
-
Asset Number: