Title Page
-
The purpose of the day’s inspections at the above site is to ascertain if the scaffolds have been effected by the recent inclement weather.
Other guidance used for this inspection is SG4 ‘Preventing Falls in Scaffolding’, TG4 ‘Anchorage Systems for Scaffolding’ and other relevant NASC guidance documentation. In addition, compliance with the Work at Height Regulations and The Health and Safety at Work Act 1974. -
Site Name/Address
-
Location of Scaffolding
-
Date and Time Inspection Report Created - (exact start time in photos)
-
Inspectors Name
Scaffold Inspection
- Scaffold
-
Description of the Scaffold Being Inspected
Observations: -
-
Details of any matters identified that could give rise to a risk to the health or safety of any of person after inclement weather.
-
Action
-
Category Item Raised
- Minor defects/observation found,
- The scaffold was found to be unsafe. The author has prohibited the use of the scaffold until remedial action is taken.
- Third Party Interference
- The scaffold was found to be unsafe due to 3rd party interference. The author has prohibited the use of the scaffold until the appropriate remedial action has been taken
-
Inspection Summary
- The scaffold inspected is safe for use at the time of the inspection
- Minor defects/observations were found while inspecting the scaffold but the scaffold remains safe. (Observations and recommended actions are detailed throughout the report).
- The scaffold was found to be unsafe. The author has prohibited the use of the scaffold until remedial action is taken.
Report Sign Off
-
All NASC Safety Guidance documents are available to download from here https://nasc.org.uk/shop/
-
Additional comments/notes (If Applicable)
-
Disclaimer - The inspector(s) believe the information contained within this report to be correct at the time of the visit. The report is based on matters which were observed or came to the attention of the inspector(s) during the assessment and should not be replied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.
-
Inspection report completed by