Information
-
Document No.
This permit shall remain on site until the job is complete or a new permit issued. Expired permits must be sent to the Safety Director. This permit is void if conditions change within the space. Evacuate the space and do not re-enter until conditions are evaluated and a new permit issued.
-
Jobsite/Number
-
Date and Time issued
-
Prepared by
Section 1
Equipment to be worked on:
Stand by personnel:
-
Personnel
Date and time expires:
-
Select date
Job Supervisor
Work to be performed:
Section 2
Atmospheric Checks:
-
Time
-
H2S PPM
-
Carbon Monoxide PPM
-
Tester's Signature
Section 3
Source Isolation (No Entry):
-
Pumps or lines blinded, disconnected, or blocked:
Ventilation modification:
-
Mechanical
-
Natural Ventilation Only
Atmospheric check after isolation and ventilation:
-
H2S PPM <10PPM H2S
-
Carbon Monoxide PPM
-
Time
-
Tester's Signature
Section 3
Communication procedures:
Rescue procedures:
-
Entry standby and backup persons successfully completed required training?
-
Is it current?
Equipment:
-
Direct reading gas monitor tested?
-
Safety harnesses and lifelines for entry and standby persons:
-
Hoisting equipment:
-
Powered communications:
-
SCBA's for entry and standby persons:
-
Protective clothing:
-
All electric equipment listed: Class I, Division I, Group D, and non-sparking tools
Periodic atmospheric tests:
-
Periodic Atmospheric Test
-
Time
-
Time
-
H2S PPM
-
Time
-
Carbon Monoxide PPM
-
Time
Section 4
We have reviewed the work authorized by this permit and the information contained here. Written instructions and safety procedures have been received and are understood. Entry cannot be approved if any squares are marked in the "NO" column. This permit not valid unless all appropriate items are completed.
-
Permit prepared by:
This permit is to be kept at the job site. Return this job site copy to the Foreman/General Foreman following job completion.
Section 5
Entrants
-
Entrants
-
Time in
-
Entrant
-
Time out
-
Entrant