Site Info
-
Project Name
-
Job Number
-
Major Work Item
-
Date
-
Sheet
-
Spec. Section:
-
Page:__of__
Items
-
Was the Superintendent/Foreman present?
-
(Material)
-
Were materials inspected for compliance?
-
Were corrective actions taken for the defective material?
-
Were corrective actions appropriate?
-
Were any deviations accepted?
-
(Installation Requirements)
-
Did work comply with specifications or plans?
-
Was workmanship satisfactory?
-
Were corrective actions appropriate?
-
Were any deviations accepted?
-
(Tests)
-
Were tests being preformed?
-
Was testing frequency satisfactory?
-
Were test samples or locations appropriate?
-
Was testing quality coordination with Mechanical/ Electrical technicians?
-
(Inspections)
-
Was inspection done by the QC Inspector in the Prep. Meeting?
-
Was the inspection frequency as established in the Prep. Meeting?
-
Were critical inspections satisfactory?
-
Was the inspection satisfactory?
-
(Safety)
-
Was the safety officer present?
-
Were the safety requirements followed?
-
Were the safety requirements modified?
-
Remarks(explanations required for "NO" responses and if deviations were accepted):
-
Reported By (QC Inspector)
-
Reviewed By: (QA/QC Administrative Manager)
-
Reviewed By: (Owner Representative)