Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
Jobsite
-
Location
-
Client
VERIFICATION:
-
1. Correct pump for use .
-
2. Correct pump delivered
-
3. Damage to pump
MOUNTING OF PUMP
-
1. Pump location as per drawing
-
2. Correct mounting bracket used
CONNECTING OF PUMP TO WATER SUPPLY AND HYDRANT SYSTEM:
-
Correct material used
-
2. Pipe brackets as required
-
3. All pipework completed in area
-
4. All pipe work pressure tested
CONNECTION OF DRAIN LINES TO PUMP
-
1. Correct material used
-
2. Pipe brackets as required
-
3. All drains connected
-
4. Drained to approved location
CONTROL PANEL
-
1. Control panel mounted in accessible location
-
2. Control panel securely fixed
-
3. Power supply connected to panel
EXHAUST SYSTEM:
-
1. Exhaust system connected to motor
-
2. Exhaust run to approved location
-
3. Exhaust bracketed as require
-
4. Material approved for use
-
5. Exhaust wrapped with approved material
COMMISSIONING:
-
1. Pump commissioned by supplier
-
2. Diesel tank filled
-
3. Water supply turned on
-
4. Electrical supply turned on
-
5. All valves locked with 003 locks
-
6. All pressure gauges working and visible
-
7. Saficant ventilation in pump room
-
8. Pump operating correctly
SIGN OFF
-
CHECKED BY:
-
SIGNATURE
-
REVIEWED BY
-
DATE: