Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

PROJECT:

  • Location

  • Jobsite

  • Client

VERIFICATION:

  • Construction drawings approved for use. Drg. No

  • DRW

  • Rev. No.

  • Material

  • 3. Materials approved for use

EXCAVATION :

  • 1. Marked out as per drawing

  • 2. Excavation to correct depth

PIPE WORK:

  • 1 Pipe install as per drawing

  • 2. Pipe install min 600mm depth

  • 3. All pipework completed in area

  • 4. Pipe size used

TRENCH COMPACTION

  • 1. Trench compactor used

  • 2. Trench compacted in 150mm layers

VALVES

  • 1. Valve install as per drawing

  • 2. Valve install in correct location

REINSTATMENT OF FINISHED SURFACE:

  • 1. Grass areas repaired

  • 2. Concrete areas repaired

  • 3. Asphalt areas repaired

SIGNOFF

  • CHECKED BY:

  • SIGNATURE:

  • DATE:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.