Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
Location
-
Jobsite
-
Client
VERIFICATION:
-
Construction drawings approved for use. Drg. No
-
DRW
-
Rev. No.
-
Material
-
3. Materials approved for use
EXCAVATION :
-
1. Marked out as per drawing
-
2. Excavation to correct depth
PIPE WORK:
-
1 Pipe install as per drawing
-
2. Pipe install min 600mm depth
-
3. All pipework completed in area
-
4. Pipe size used
TRENCH COMPACTION
-
1. Trench compactor used
-
2. Trench compacted in 150mm layers
VALVES
-
1. Valve install as per drawing
-
2. Valve install in correct location
REINSTATMENT OF FINISHED SURFACE:
-
1. Grass areas repaired
-
2. Concrete areas repaired
-
3. Asphalt areas repaired
SIGNOFF
-
CHECKED BY:
-
SIGNATURE:
-
DATE: