Title Page

  • Job Number

  • Project Name

  • Conducted on

  • Project Manager

  • Temperature

  • Location In Building

  • Confirm Hm doors (plumb & true) windows, frames, studs and headers are plumb, square, and level

  • Notes

  • Add media

  • Confirm all bottom track shot down per plans and specs

  • Notes

  • Add media

  • Confirm MEP wall layout complete prior to wall framing

  • Notes

  • Add media

  • Confirm stud spacing, bridging, blocking, clips and flat strap is installed per plans and specs

  • Notes

  • Add media

  • Confirm wall studs sit tight to web in bottom track and are fastened per plans and specs

  • Notes

  • Add media

  • Confirm non-full-height wall kickers installed per plans and specs

  • Notes

  • Add media

  • Confirm top track is plumb

  • Notes

  • Add media

  • Confirm walls are plumb and true

  • Notes

  • Add media

  • Confirm control joints are laid out per plans and specs (if applicable)

  • Notes

  • Add media

  • Confirm stud framing (walls, ceiling, or soffits) are plumb, square, and level

  • Notes

  • Add media

  • Confirm approved recessed accessories are framed per plans and specs

  • Notes

  • Add media

  • Confirm framing and MEP signed off prior to wall close up

  • Notes

  • Add media

  • Confirm on full height walls, studs are installed per plans and specs

  • Notes

  • Add media

  • Sign Off

  • Forman

  • Q.C. Sign Off

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.