Title Page
-
Site conducted
-
Complete this audit reviewing each inspection point in the context of Summers Engineering. Where required, provide evidence in text form of conformity and non-conformity. At the end of the audit, plan and allocate non-conformity to the appropriate management employee for them to resolve. Every question is mandatory to ensure the audit is fully completed.
-
Conducted on
-
Prepared by
-
Location
-
6.1 Has Summers Engineering planned for the issues referred to in section 4.1 and requirements referred to in section 4.2? Answer this with reference to Summers Engineering - Risk and Opportunities document.
-
Evidence for no:
-
Evidence for yes:
-
6.2 Has Summers Engineering established Quality Objectives? Do these Quality Objectives address the following:<br><br>- Consistent with the quality policy<br>- Measurable<br>- Consider applicable requirements<br>- Relevant to customer satisfaction<br>- Monitored<br>- Communicated to employees<br>- Updated as appropriate
-
What are Summers Engineering's Quality Objectives? Provide evidence that they have been monitored, measured and updated as appropriate.
-
Evidence for no:
-
Review Summers Engineering's 'Procedure - Change Management'; is it effective at meeting clause 6.3 of ISO 9001:2015 requirements? Answer with consideration of:<br><br>- Considerations about the purpose of change and it's consequences<br>- Procedures ability to maintain the integrity of the QMS<br>- Resource availability<br>- Takes into account the allocation and re-allocation of responsibilities
-
Evidence for no:
-
Give evidence or comment on the Procedure's effectiveness
Traceability
-
Sign to confirm Internal Audit 6 was completed.