Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Untitled Page
1.0 Training Program (Safety / Training Department)
-
Does the site have a written Lock out tag out / Hazardous energy containment program?
-
Does the site have an Authorized person training?
-
Does the site have an awareness level training for New hires?
-
Are contractors trained on current plant policies regarding Lock out - Tag out?
-
Does the site training program contain basic knowledge for how to recognize applicable energy sources? 1910.147(c)(7)(i)(A)
-
Does the site training contain detailed information on all facility Lock out - tag out procedures?
-
Does the site training program contain basic procedures for removing a forgotten lock? 1910.147(e)(3)
-
Does the site train authorized employees to the limitation of tags if a tag system is used? 1910.147(c)(7)(ii)
-
Does the site have retraining requirements? 1910.147(c)(7)(iii)
-
Does the site have a written procedure for jogging a machine? 1910.147(f)(1)
-
Does the site have an observation program in which all new LOTO authorized employees are observed?
2.0 Lock Out Tag Out Program (Safety / Maintenance)
-
Does the site have established procedures for each required machine to be locked out? 1910.147(c)(4)(i)
-
Does the site have LOTO devices available to employees for the application of locking out a machine?
-
Does the site have a Tag system that may be utilized in the event a machine is not capable of being locked out? If no machines exist mark N/A. 1910.147(c)(2)(i)
-
Sites with tag systems have demonstrated that equivalent safety will be achieved as using a lock-out system? 1910.147(c)(3)(ii)
-
Where full de-energization is not practical, has the site demonstrated other means to provide full employee protection? 1910.147(c)(3)(ii)
-
Do Lock out tag out procedures clearly outline scope, purpose, authorization, rules and techniques to be utilized? 1910.147(c)(4)(ii)
-
Does the employer conduct periodic inspections at least annually? 1910.147(c)(6)
3.0 Equipment Specifications / Safety Devices (Visual Inspection)
-
Are lock-out devices used for the sole purpose of controlling hazardous energy? 1910.147(c)(5)(ii)
-
Are lock out devices durable and not deteriorated? 1910.147(c)(5)(ii)(A)
-
Are all locks standardized across plant site? 1910.147(c)(5)(ii)(B)
-
Are all tag out devices substantial enough to prevent accidental removal?
-
Are all tag out devices non-reusable and attached by zip or cable ties. 1910.147(c)(5)(ii)(C)(2)
-
Do tag out devices have warning label on them with identifiable labeling?
4.0 Employee Knowledge (Employee Questions)
-
Does the authorized employee properly utilize lock and tag devices?
-
Does the employee place a tag and lock on the energy isolating device?
-
Does the employee verify that the isolation and de-energization have been achieved? 1910.147(d)(6)
-
Each employee removes their device in accordance to plant policy?
-
Do Authorized employees understand all their responsibilities as it pertains to Locking out a machine?
-
Do employees recognize the dangers if a machine is not locked out properly and all procedures are not followed?
5.0 Documentation and Retention (Engineering / Maintenance / Safety)
-
Are training documents retained for the period of employment plus 3 years?
-
Have all retraining documents been maintained containing employees name and date of training? 1910.147(c)(7)(iv)
-
Have all annual inspections been retained for authorized employees?