Information
-
Customer:
-
Site name:
-
Site Address:
-
Document No.
-
Prepared by
-
Conducted on
WRS SOLUTIONS
-
Version one - January 2016
-
Contact Name:
-
Time & Date Arrived onsite:
-
Time & Date left site:
GENERAL
-
Site documentation present/accurate?
-
Attach photo
-
Time/Date correct?
CONTROL AND INDICATING EQUIPMENT
-
Control panel details:
Panel
-
Manufacturer:
-
Model:
-
Control panel location:
-
Zone expanders fitted?
-
Locations:
-
All peripheral equipment online?
-
Details:
-
Does the system set/unset?
-
MAY USE EVENT LOG
-
Zones isolated or removed?
-
Details:
-
Tampers/faults outstanding on system?
-
Details:
-
Faults resolved?
-
Further action required by:
-
Details:
DETECTION DEVICES
-
Visual inspection of frequently used devices?
-
Environmental conditions checked for adverse effects?
-
Correct operation of devices?
-
Hold-up devices installed?
-
MUST ENSURE SYSTEM IS ON TEST WITH ARC BEFORE ACTIVATING!!
-
Checked for correct operation?
-
Details:
-
Wireless devices onsite?
-
PLEASE CHECK BATTERY LEVELS OF MOST FREQUENTLY USED DEVICES AND REPLACE IF REQUIRED
-
Voltage levels ok?
POWER SUPPLIES
-
Visual inspection for damage/corrosion?
-
Voltages within limits?
-
Back-up battery on charge voltage?
-
Back-up battery off charge voltage?
-
Current battery installation date?
-
Additional back-up batteries onsite?
-
Location:
-
On charge voltage:
-
Off charge voltage:
WARNING DEVICES
-
Correct operation of bell box?
-
Bell box hold off test checked?
ALARM TRANSMISSION SYSTEMS
-
IAS monitored?
-
Which device?
- Dual Com
- Emizon
- RedCare
- Other
-
Name of ARC?
-
Chip/reference number:
-
Correct operation of all paths/signals?
FAULTS
-
Faults found?
-
Details of fault:
-
Faults resolved?
-
Recommended action:
-
Were any parts used?
-
Parts used:
-
DETAILS OF PARTS MUST BE ENTERED ABOVE
-
Further action required?
-
Further action required by WRS?
-
Further action required:
-
Further action by Client?
-
Further action required:
-
Are further parts required?
-
Parts required:
-
Are further materials required?
-
Materials required:
SIGN OFF
-
Engineers present:
- Simon Hutchinson
- Kenny Robson
- Thomas Needham
- Simon Mason
- Trevor Restall
-
Add signature
-
ENGINEER TO PRINT AND SIGN ABOVE!!
-
I hereby certify that the works described above have been carried out and have been completed to my satisfaction. I agree that any outstanding works have been explained and I agree to arrange for any outstanding or further works described under the "Further action required by client" section above to be carried out. I also undertake to ensure payment of any applicable charges. Current standard charges are £50 call out and £42.50 per hour labour charge, plus any parts charges.
-
Add signature
-
CLIENT TO PRINT AND SIGN ABOVE