Information
-
Customer Name
-
Customer Address
-
Contract Number
-
Conducted on
-
System Make and Model
-
System Grade
Visit Type
-
Visit Type
- Preventative maintenace
- Corrective maintenace
Panel Checks
-
1 - Check the Installation, Location and Siting of all the equipment & Devices against the system record, the as fitted document and log book
Devices
-
Number of installed devices
-
Panel Type
-
Panel location
-
location of any other Expanders, Power supplies, keypads etc
-
2 - Have there been any changes to the property ?
-
3 - Check the satisfactory operation of all the devices including deliberately operated devies ( including tampers) - detail anything that could not be tested
-
4 - Inspect all flexible connections & ensure cable fittings & equipment are secured & adequately protected
-
5 - Check the control and PSU equipment, including connections. Complete control panel and PSU check list.
-
6 - Check remote signalling equipment for correct operation to ARC ( if applicable), All Signals to be tested to ARC and that can not need to be detailed in engineers comments
-
signals checked for correct operation through to ARC
- 1 - Fire
- 2 - Panic
- 3 - Intruder
- 4- Open & Close
- 5 - Zone omitted
- 6 - Technical Fault
- 7 - Confirmed
- 8 - Tamper
- 9 - Grade 3 Engineer on site
- 10 - Grade 3 mains fail
- 11 - Site specific
- 12 - Site specific
-
7 - Check Line / GSM fault monitor for corect operation (if applicable)
-
8 - Check all signalling paths for correct operation
-
9 - Check that the ARC Keyholder record is correct
Add new Keyholders
-
Name of new contact
-
Phone Number of New contact
-
names of keyholders that need to be removed
-
10 - Where applicable, check with ARC all system signals are restored and the system is taken of test
-
11 - Check all audible warning & Alarm devices for correct operation.
-
12 - Check SAB activates when hold off voltage removed
-
13 - Check SAB Tamper circuit
-
14 - Check the alarm system is fully operational ( detail anything that is identified at non-functional)
-
15 - Check all Batteries ( altenative power source) in SAB's, EXP's, RKP's & Detection devices for performance
-
16- Check wireless signall strengths against those taken at time of comissioning
-
17- Entry/ Exit procedure checked
-
18- Check the exit sounds can be heard throughout the exit route
Control Panel Checks
-
1 - Aux Volts (volts)
-
2 - Bell tamp return volts (Volts)
-
3 - battery Charging Volts (volts)
-
4 - Battery Charging Current (ma)
-
5 - Global Tamper ( Ohms)
-
6 - System current normal ( Mains Off) (Ma)
-
7 - System current in Alarm ( Mains Off ) (Ma)
-
Is battery the correct size ( complete calculation as follows: System current normal X 15 + System current in Alarm )
-
Battery size installed
Power supplies on the system
-
Are there any additional power supplies on the system
PSU Checks
-
1 - Aux Volts (volts)
-
2 - Bell tamp return volts (Volts)
-
3 - battery Charging Volts (volts)
-
4 - Battery Charging Cuurent (ma)
-
5 - Global Tamper ( Ohms)
-
6 - System current normal ( Mains Off) (Ma)
-
7 - System current in Alarm ( Mains Off ) (Ma)
-
Is battery the correct size ( complete calculation as follows: System current normal X 15 + System current in Alarm )
-
Battery size installed
-
14 - Preventative Maintenance checks completed and system left in full working order ( take photo of keypad in Day mode)
-
Provide details as to why the system has not been left in working order
Corrective Call details
-
Reported fault
-
Tyep of signalling
- Redcare/GSM
- DC
- Dualcom
- Audible only / APP / Keyholder only
-
Any evidence photos prior to fixing fault ( ie builders damage/water damage etc)
-
cause of callout:
-
Further details and actions carried out
-
Any further Action required
-
Detail further action needed
-
System Reset
-
Method of resetting
-
Charge for call (£)
-
Amount (£)
-
Date & Time call recieved
-
Date/Time arrived on site
-
Time on site
-
Travel time
-
Material Costs (£)
-
Parts Used (list all)
-
The system has been left in full working order ( take photo of keypad in Day mode)
-
Provide details as to why the system has not been left in working order and/or any temprory or permenant disconnections made
Sign off
-
Where completion of any of the tests listed above are impracticable then any tests not completed must be recorded and agreed by the customer
-
Detail any checks/areas that have not be tested as part of this maintenance and the reason
-
Any additional works or quotes required
-
Provide details
-
Engineers name
-
Engineers signature
-
Customers name
-
Customer signature
-
Date