Information

  • Customer Name

  • Customer Address
  • Conducted on

  • System Make and Model

  • System Grade (Intruder systems only)

Visit Type

  • Visit Type

  • System Type

Intruder Alarm Preventative Maintenance Checks

  • Contract Number

Panel Checks

  • 1 - Check the Installation, Location and Siting of all the equipment & Devices against the system record, the as fitted document and log book

Devices

  • Number of installed devices

  • Panel Type

  • Panel location

  • location of any other Expanders, Power supplies, keypads etc

  • 2 - Have there been any changes to the property ?

  • 3 - Check the satisfactory operation of all the devices including deliberately operated devies ( including tampers) - detail anything that could not be tested

  • 4 - Inspect all flexible connections & ensure cable fittings & equipment are secured & adequately protected

  • 5 - Check the control and PSU equipment, including connections. Complete control panel and PSU check list.

  • 6 - Check remote signalling equipment for correct operation to ARC ( if applicable),

  • confirm signals checked for correct operation through to ARC

  • Are there any signals that could not be checked, if yes please detailed in notes

  • Why was signalling not checked

  • 7 - Check Line / GSM fault monitor for corect operation (if applicable)

  • 8 - Check all signalling paths for correct operation

  • 9 - Check that the ARC Keyholder record is correct

  • Add new Keyholders
  • Name of new contact

  • Phone Number of New contact

  • names of keyholders that need to be removed

  • 10 - Where applicable, check with ARC all system signals are restored and the system is taken of test

  • 11 - Check all audible warning & Alarm devices for correct operation.

  • 12 - Check SAB activates when hold off voltage removed

  • 13 - Check SAB Tamper circuit

  • 14 - Check the alarm system is fully operational ( detail anything that is identified at non-functional)

  • 15 - Check all Batteries ( altenative power source) in SAB's, EXP's, RKP's & Detection devices for performance

  • 16- Check wireless signall strengths against those taken at time of comissioning

  • 17- Entry/ Exit procedure checked

  • 18- Check the exit sounds can be heard throughout the exit route

Control Panel Checks

  • 1 - Aux Volts (volts)

  • 2 - Bell tamp return volts (Volts)

  • 3 - battery Charging Volts (volts)

  • 4 - Battery Charging Current (ma)

  • 5 - Global Tamper ( Ohms)

  • 6 - System current normal ( Mains Off) (Ma)

  • 7 - System current in Alarm ( Mains Off ) (Ma)

  • Is battery the correct size ( complete calculation as follows: System current normal X 15 + System current in Alarm )

  • Battery size installed

  • Are there any concerns from the control panel checks

Power supplies on the system

  • Are there any additional power supplies on the system

PSU Checks

  • 1 - Aux Volts (volts)

  • 2 - Bell tamp return volts (Volts)

  • 3 - battery Charging Volts (volts)

  • 4 - Battery Charging Cuurent (ma)

  • 5 - Global Tamper ( Ohms)

  • 6 - System current normal ( Mains Off) (Ma)

  • 7 - System current in Alarm ( Mains Off ) (Ma)

  • Is battery the correct size ( complete calculation as follows: System current normal X 15 + System current in Alarm )

  • Battery size installed

  • Are there any concerns from the PSU checks

CCTV Preventative Maintenance checks

  • Contract Number

  • Check the number and type of cameras, including lenses, are per the specification and any amendments.

  • Check indicators are working correctly.

  • Check warning labels are still in place.

  • Check all cables and conduit are properly supported, undamaged and showing no signs of wear.

  • Check for sound physical fixings of all equipment including loosening or corrosion of supports and fixings including towers and brackets.

  • Check all glands and seals on external equipment.

  • Check the image quality of each camera against the reference images obtained during commissioning.

  • Covers and housings have been removed and interiors cleaned where necessary.

  • Check all automatic and remote control camera functions are satisfactory and that camera movement and fields of view are free from obstruction.

  • Operation of all monitoring, switching, recording and store equipment is satisfactory.

  • Function of all interfaces with alarms is satisfactory including correct triggering of alarms.

  • Operation of on-board / supplementary lighting is satisfactory.

  • Image retention still meets requirements specified

  • Logs are functioning correctly

  • All system software and firmware patches and upgrades are up to date

  • Check that the performance of the system continues to meet the agreed specification & User requirements

Access Control Maintenance Checks

  • Contract Number

  • The installation, location and siting of all equipment and devices against the<br>as-fitted document

  • The operation of all equipment is satisfactory

  • All flexible connections & Physical connections ok

  • The normal and standby power supplies(where fitted), correctly functioning

  • The control equipment is functioning in accordance with your designed procedures, check locks , readers, request to exits, emergency release mechanisms, fire interfaces

  • The operation of any warning device in the system ok

  • The correct operation of all system security functions is ok

  • System application and operating software is up to date with the<br>latest security patches and critical updates installed, If it is not practicable to update during the maintenance agreement with the customer should be sought to conduct at a convenient time.

  • Record current versions

  • Verify customer responsibilities have been carried out, and inform the<br>customer of any required corrective actions (I.E door closers not functioning correctly)

  • 14 - Preventative Maintenance checks completed and system left in full working order

  • Provide details as to why the system has not been left in working order

  • Take a photo of the system in its current operation mode

  • Take a photo of the system in its normal operation mode

Corrective Call details

  • Contract Number

  • Reported fault

  • Tyep of signalling

  • Any evidence photos prior to fixing fault ( ie builders damage/water damage etc)

  • cause of callout:

  • Further details and actions carried out

  • Any further Action required

  • Detail further action needed

  • System Reset

  • Method of resetting

  • Charge for call (£)

  • Amount (£)

  • Date & Time call recieved

  • Date/Time arrived on site

  • Time on site

  • Travel time

  • Material Costs (£)

  • Parts Used (list all)

  • The system has been left in full working order ( take photo of keypad in Day mode)

  • Provide details as to why the system has not been left in working order and/or any temprory or permenant disconnections made

Sign off

  • Where completion of any of the tests listed above are impracticable then any tests not completed must be recorded and agreed by the customer

  • Detail any checks/areas that have not be tested as part of this maintenance and the reason

  • Any additional works or quotes required

  • Provide details for quote required

  • Time arrived

  • Time departed

  • Engineers Name & Signature

  • Customer Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.