Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
HSQE/ General Requirements
-
Relevant Project HSQE Documentation available?
-
Evidence of certification/calibration records for all critical equipment on site?
-
Method Statements/Approved procedures in place , communicated to the relevant people and being followed?
-
Site specific Risk Assessment available, adequate and communicated?
-
Accident, incident, Hazard reporting System in place?
-
All operatives carrying appropriate certification (boundary box installation, ID Card! SafePass ,CSCS)?
-
Access to site being controlled and risk being communicated to all contractors/visitors?
-
Safety Data Sheets and Chem Risk Assessments available for chemicals on site?
-
Regular TBT/daily HSEQ briefing conducted and documented?
Quality
-
Evidence of functioning document managing system - correct versions of all IW & Farrans documents?
-
Documentation correctly presented and filed?
-
Disinfectant solution and chlorine wipes and bring used to disinfect tools, test equipment etc?
-
Good standard of hygiene maintained on site (no contamination on customer supply)?
-
Are all fittings bagged until installation?
-
Are all vehicles, plant and contents on site clean and presentable?
Traffic Management & Public Safety
-
Is the TM system suitable to the area in which it has been set up and have any minor deviations from the main plan been recorded if required?
-
TMP managed on site by CSCS SLG Operative? (onsite at all times)
-
Adequate advance warning/general signs for motorists,pedestrians,personnel and plant?
-
Have the Gardai been notified of any positive traffic flow systems prior to deployment?
-
Safe routes provided for pedestrians/cyclists/disabled access?
-
Is all traffic management equipment properly erected/secured and maintained?
-
Crew vehicles parked safely?
-
Housekeeping- paths clean and free of trip hazards?
-
Members of the public being protected from physical agents(noise,dust etc)?
Excavations & Utilities
-
Relevant utility drawings available on site/confirmed with the utility provider?
-
Pre-Construction survey information consulted before commencing work?
-
Have services been located by a CSCS trained operative and marked?
-
Is survey equipment on site, calibrated and working? (CAT & Genny)
-
Depth of excavation notes and required inspections in place?
-
Physical barriers erected around excavations & clipped/secured?
-
Excavation supports, as required, noted and adequate (shoring, battering,temp works design).
-
Excavated Matierals tired safely, away from edge of excavation?
-
Safe means of access/egress?
-
Overhead ESB lines identified and controls in place?
-
Are excavations left overnight secured with fixed plates or fencing/barrier system(excavation back filled flush with existing surface)?
Fire,Emergency & First Aid
-
Emergency procedures and assembly point noted in project documentation?
-
Adequate number and type of fire extinguishers in place and readily accessible at site?
-
First aid kit available and suitable for the hazards on site?
-
Local first Aider for site and identified?
PPE, Ergonomics, Welfare
-
Are on all site wearing the correct PPE?
-
Appropriate additional PPE available and worn as required?
-
Are PPE supplies in good condition and stored correctly?
-
Are welfare facilities available(toilets,hand washing,eating)?
-
Manual handling avoided where possible, mechanical aids provided?
Tools,Plant & Equipment?
-
Mobile plant on site generally in good condition and evidence of weekly inspection log?
-
Lifting equipment and accessories inspected and certified?
-
Work at height equipment inspected weekly and certified?
-
Equipment being operated by certified plant operators?
-
Mobile plant fitted with visual aids, mirrors, cameras, lights beacons as required?
-
Mobile plant switched off and keys removed when not in use?
-
Appropriate safety pins, retaining clips in place?
-
Is the correct plant and equipment being used and stores correctly?
-
Hand and power tools in good condition and appropriately guarded/insulated?
-
All electrical equipment being used is 110v or less?
-
Electrical equipment in good condition, well positioned, and inspected as required?
-
Towed plant attachments in place (jockey wheel,safety chain, lights etc)?
Waste Management
-
Waste management documentation available?<br>(Collection Permit,Facility Permit,Waste Dockets)?
-
Hazardous &Non Hazardous waste management adequate(storage,segregation & disposal)?
-
Good standard of house keeping no littering?
-
Is the excavated material contained within the works area and regularly removed?
-
Are adequate bins or skips provided for storing waste before removal?
-
Are paths and walkways clean when returned to public use?
Emissions to Atmosphere/Ground
-
Plane/site materials stores in designated tidy areas?
-
Chemical and hazardous substances labelled correctly, stored safely and bundled (eg drip tray)?
-
Drip trays available for use during refuelling of plant/equipment?
-
Adequate spillage control and trained personnel available and sufficient?
-
Environmental Emergency response plan available?
-
Plant and equipment well maintained and emissions controlled?
-
Fugitive emissions to atmosphere/ground controlled?
Water &Energy Management
-
Evidence of waterway pollution risk?
-
Water discharges controlled and following procedures?
-
Evidence of uncontrolled water leak?
-
Efficient use of energy on site?