Information
-
Job Number:
-
Site Location
-
Client Name
-
Conducted on
-
Inspected by
-
Site Supervisor
-
List Irwin M&E personnel and subcontractors on site:
Site Folder and Paperwork
-
Has actions from previous audit been completed?
-
Is there a Site File on site?
-
Have all engineers been inducted to site?
-
Have all engineers and personnel signed into site?
-
Is there a Safe system of work and Risk Assessments available on site corresponding to the works?
-
Has the Safe system of work been read/understood & signed by all engineers?
-
Take a photo of signed Safe system of work.
-
Are weekly toolbox talks being carried out?
-
Take photo of most recent Toolbox Talk
-
Does all employees on site carry CSR/CSCS cards and relevant training?
-
Have weekly ladder checks been completed?
-
Are COSHH assessments available for hazardous substances on site?
-
Are all subcontractors cleared and training information provided?
-
Have subcontractors submitted Health & Safety Documentation for the works?
-
Does this job operate a permit to work system?
-
Take photo of permit to work
Working Area
-
Is there adequate access and egress throughout workplace?
-
Is there good housekeeping & have materials been stored correctly?
-
Is there adequate safety signage in place?
-
Are emergency procedures in place?
-
Are Irwin M&E producing waste on site?
-
Are Irwin M&E segregating and disposing of waste as per requirements?
-
Please state who is responsible for the disposing of all site waste
Means of Access
-
Are ladders or steps being used?
-
Are Ladders / Steps numbered and in good condition?
-
Is the operative keeping 3 points of contact with the ladder / Steps?
-
Are Irwin M&E personnel using mobile towers on site?
-
Has Mobile Tower Scaffold been erected correctly with Tags in place?
-
Was the Mobile Tower Scaffold erected by a competent person (PASMA)?
-
Take photo of scaffold / Scaff tag
-
Are Irwin M&E using MEWPs (scissor lift/Cherry pickers) on site?
-
Is the operative IPAF trained to the correct level?
-
Is there a maintenance record available for MEWP?
-
Are adequate safety precautions being taken? e.g. Harness/outriggers/guard rails.
Plant and Equipment
-
Are Operatives wearing the required PPE?
-
Are Power tools in good general condition?
-
Has a Portable Appliance Test (PAT) been carried out in the last 6 Months? (3 months across the water)
-
Date of PAT
-
Attach photo of PAT sticker
-
Do engineers have Lock Out Tag Out kit?
-
Do engineers have a test meter on site?
-
Has this been tested in house within this last 6 months? Or calibrated within the last year?
-
Is there a company vehicle on site?
-
Enter Vehicle Registration
-
Is the vehicle in good condition and working order?
-
Is there a First Aid kit on site? (Adequately stocked and in date?)
-
Is there a Fire Extinguisher on site?
-
Has the Fire Extinguisher been serviced within the last year?
Closing Out
-
Have the findings of the inspection been relayed to site supervisor?
-
Signature of person conducting audit