Information
-
Job Number:
-
Site Location
-
Client Name
-
Conducted on
-
Inspected by
-
Site Supervisor
-
List Irwin M&E personnel and subcontractors on site:
Coronavirus - Covid-19
-
Are all personnel on site currently free from Covid-19 and/or symptoms of Covid-19?
-
As per government guidance ensure said personnel leaves site immediately and self-isolates as required.
-
Are client/site specific Covid-19 procedures being adhered to where necessary?
Site Folder and Paperwork
-
Have corrective actions from previous audit/s been completed?
-
Have all relevant personnel signed into site?
-
Have all relevant personnel been inducted to site and induction forms completed fully? (please attach photo/s)
-
Are there in date RAMS available on site corresponding to the relevant works? (including sub-contractors)
-
Has the RAMS been read, understood and signed by relevant personnel? (please attach photo/s)
-
Have sub-contractors on site been approved by IME?
-
Do they have relevant security clearance?
-
Does all relevant personnel on site have in date CSR/CSCS cards and appropriate training for the works?
-
Are relevant COSHH assessments available on site?
-
Are there any live permits to work on site at the time of audit? (please attach photo/s)
Work Area
-
Is there adequate access and egress throughout site?
-
Is housekeeping being kept to a good standard throughout site?
-
Are all materials being stored appropriately on site?
-
Is there adequate safety signage on site?
-
Are emergency procedures in place?
-
Is waste being produced on site? If yes how is this being disposed of?
Working at Height
-
Are ladders/steps being used on site?
-
Are they in good condition?
-
Are they being used appropriately?
-
Are podium steps being used on site?
-
Are they in good condition?
-
Are they being used appropriately?
-
Are mobile tower scaffolds being used on site?
-
Was tower erected by a PASMA trained operatives with scaff tags in place? (please attach photo/s)
-
Is the tower being used appropriately?
-
Are MEWP's being used on site?
-
Is the operative IPAF trained to the correct category? (1B/3B/3B)
-
If hired is there a certificate of thorough inspection available within the MEWP? (please attach photo)
-
Has working at height rescue plan been completed prior to works commencing? (please attach photo)
-
Are weekly MEWP inspections being carried out? (please attach photo/s)
-
Is there any fixed scaffolding in place on site under the control of Irwin M&E?
-
Have RAMS been reviewed/approved by Irwin M&E SHEQ Dept?
-
Is there a crane on site under the control of Irwin M&E?
-
Have RAMS been reviewed/approved by Irwin M&E SHEQ Dept?
Equipment, Tools & Company Vehicles
-
Are relevant personnel wearing the required PPE?
-
Are power tools in good condition?
-
Has portable appliance testing (PAT) been carried out in the last 6 Months? (please attach photo/s)
-
Is there a Lock Out Tag Out (LOTO) kit needed/required on site?
-
Is there mechanical/electrical test equipment on site? (If yes please attach photo/s)
-
Has the test equipment been tested in-house within the last 6 months or calibrated within the past year? (please attach photo/s)
-
Is there a company vehicle on site? (please attach photo of registration)
-
Is the vehicle free from damage? (check all panels, sides and take photos)<br>
-
Are all tyres and tyre tread in good condition (use tyre thread checker where required, tyre tread should be no less than 2mm)
-
Are contents of the vehicle in reasonable condition? (van should be kept tidy with minimal waste)
-
Are weekly Hilti checks being carried out? (please attach photo/s)
-
Is there an in-date/stocked first aid kit on site?
-
Is there a fire extinguisher on site and has this been serviced within the last year? (please attach photo/s)
-
Are there any other issues on site affecting health, safety or the environment?
-
Are there any other issues/queries/requests presented by personnel?
Closing Out
-
Has findings of the audit been discussed on site?
-
Signature of person conducting audit