Title Page
-
Job Number
-
Site
-
Client
-
Conducted on
-
Prepared by
-
Personnel on Site
Paperwork & Work Specific Details
-
Has Operative/s signed into site?
-
Is Operative/s wearing PPE as required?
-
Have all Operatives on site been Inducted?
-
Are induction forms completed fully? (all sections completed)
-
Has Safe System of Work and Risk Assessments been prepared for this job?
-
Is the Safe System of Work in date?
-
Have all operatives on site read / understood and signed the Safe System of Work?
-
Take a photo of the Communication Register
-
Are sub-contractor's on site?
-
Are Sub-Contractor's approved within Irwin M&E Ltd?
-
Have Sub-Contractors provided adequate Risk Assessments/Method Statements for works?
-
Do all Operatives have in date CSR/CSCS cards and have relevant training for the works?
-
Is there a permit to work system in place for this job?
-
Attach a photo of Permit to Work
-
Does Irwin M&E display good housekeeping on site?
-
Is there adequate access and egress throughout site?
-
Have all materials / tools / equipment been stored appropriately on site?
Plant & Equipment
-
Are ladders/steps being used on site?
-
Are they in good condition?
-
Are they being used appropriately?
-
Are any other methods of access being used on site to work at height? (Hop up steps, Podiums, MEWPS, Mobile Tower Scaffold)
-
State method and controls in place.
-
Is all testing equipment in good condition? (Probes / Leads / Voltage Meter / Proving Dead Unit)
-
Have portable electrical appliances been PAT tested within 6 months?
-
Attach a photo of PAT sticker
-
Is there a Lock Out Tag Out (LOTO) Kit on site?
-
Is there a Test Meter on site?
-
Has this undergone in-house calibration check box inspection within this last 6 months? Or been calibrated within the last year?
Company Vehicle
-
Is there a company vehicle on site?
-
Enter Registration
-
Does the van have an Irwin M&E van folder?
-
Does the file contain all relevant information/forms?
-
Is there an in-date/stocked First Aid kit on site?
-
Is there a Fire Extinguisher on site? (Has is been serviced within this last year?)
Closing Out
-
Has finding of the audit been discussed with Site Supervisor?
-
Signature of person conducting audit