Title Page

  • Job No.

  • Site

  • Inspection Title

  • Inspection Carried Out on

  • Carried out by

  • Site Manager

  • Project Manager

  • Location
  • Scoring methodology: 1 = Unacceptable Performance; 2 = Advisory Performance; 3 = Satisfactory Performance; 4 = ISG Exemplary Performance

    Please Remember – All Site Inspections are at a point in time and are a pivotal element of our ongoing objective to deliver all our projects to the highest of health and safety standards - they are not a “policing” activity - it is this ongoing focus that enables us to drive forward our ever improving health and safety culture
    Where a Category Score of a 1 or 2 is recorded - please undertake action as prompted in accordance with the deadline


  • 1. Security and Site Set Up - Signing In & Out (Sections B2 & B3 of PCMP & R930<br><br>Where all points of entry to site secured or manned?<br>Are signing in and out procedures being followed?<br>Is site set up in an acceptable manner?<br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 2. Inductions - (R931, R932, R933, R934) <br> <br>Are inductions being carried out and recorded correctly?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 3. Risk Assessments / Method Statements - (R920 & R921)<br><br>Are all RAMs located in file that are required for current works being carried out?<br>On review of RAMS are they adequate and site specific? <br> <br> <br> <br> <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 4.Asbestos - (R904 & R&D Survey) <br> <br>Are all relevant forms completed and located in file? <br>Are asbestos plans displayed on site?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 5. Fire Risk Assessment / Fire Plan Management - (R905 & R906)<br> <br>Is FRA complete in file?<br>Are Fire plans on display?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 6. Working At Height - Planned Operation - (Section B2 & B3 of PCMP)<br><br>Are all WAH being managed?<br>Are all WAH equipment suitable & Safe?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 7. Mobile Scaffold Towers - (R962) <br>Are all mobile towers either full assembled & signed off for use or full dismantled?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 8. Ladders & Steps - (R946 & R962) <br> <br>Are steps only being used as a last resort / best access for task?<br>Are all PTW in place?<br>Are steps being used correctly?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 9. Other Access Equipment - MEWPS, Electric Pop -Ups (R962 or R964) <br>Are all inspections complete?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 10. Welfare Facilities - (Schedule 2 - Section B2 & B3 & C2 of PCMP)<br><br>Is there Hot running water in WCs & Kitchen?<br>Is there a means of heating food?<br>Is there a suitable rest area?<br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 11. Housekeeping and Material Storage -(Section B2 PCMP) <br>Is site clean & tidy?<br>Is there safe material storage areas?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 12. Access and Egress - (Section B2 and B3 of PCMP) <br>Is there safe, clear unobstructed access to and from site?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • Indicate what corrective action is required / requested.

  • General Comments

  • 13. Work Equipment and Hand Tools - (R963) <br>Are all power tools PAT Tested?<br>Are all tools in good condition?

  • Photo of area to be addressed

  • General Comments

  • 14. Personal Protective Equipment (PPE) - 5 Point - Respitory Protective Equipment (RPE)<br><br>Are all operatives wearing full 5 point PPE?<br>Is all task specific PPE being Used?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 15. Electrical Works - (Section B2 & B3 PCMP)<br><br>Are all electrical works being carried out safely?<br>Is there adequate Temp power & lighting provided?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 16. Manual Handling - (R928) <br> <br>Are correct manual handling procedures being followed?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 17. Occupational Health - HAV Records and Noise Assessments - (R926 & R927) - Dust Suppression<br><br>Is Adequate dust extraction being used?<br>Has HAV form been complete if required? <br>Has Noise Assessment been carried out if required?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 18. Temporary Works - (R912) <br><br>Has all temp works been signed off?<br>Are all sign off documents on site?<br>Has register been completed? <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 19. Fixed Scaffold - (R913 & R968) <br><br>Has designs been signed off and present on site? <br>Is scaffold erected as per design?<br>Is scaffold inspection up to date?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 20. Hoarding Internal/External - (R913 & R969)<br><br>Has hoarding design been signed off and present on site?<br>Has weekly hoarding inspection been carried out?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 21. Cranes and Lifting Equipment - (R914) <br> <br> Has lifting plan been signed of and present?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 22. COSHH Register & Assessments - (R924 & R925) <br> <br> <br> <br>Are all relevant COSHH assessments present

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 23. Lighting - (Section B2 & B3 PCMP) <br><br>Is there adequate lighting on site to allow works to be carried out safely?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 24. Demolition - (Section B4 PCMP & R950) <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 25. Enviromental Management - (Section B5 PCMP) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 26. Waste Management - (R858) <br> <br>Is Waste being managed on site?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 27. Driver Operated Plant - (R971) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 28. Underground / Overground Services - (Section B2 & B3 of PCMP) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 29. Excavations Shafts & Tunnels - (R951 & R961) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 30. Transport & Logistics Plan - (R907 & R908) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 31. Pollution Control & Biological Hazards - (Section B2 & B3 of PCMP) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 32. Storage of Flammable Liquids and Gases - (Section B4 PCMP)

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 33. Hoist and Lifting Beams - (R970) <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 34. Confined Spaces - (R951) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 35. PCMP Document - (R901 or R902) - Project Deliverable Plan - (PDP - R508) PCI Document - (R900a) - If Applicable <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 36. Training and Compentency Skill Cards - Site Manager Passport (R903) & Induction Details <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 37. Communication & Workforce Involement - TBT - (R935 & R936) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 38. Statutory Signage - (PMS) <br> <br>Is H&S notice board put up with all relevant insurances and F10 shown?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 39. General Site Signage - Sufficient to Work being undertaken <br>Is there adequate site safety signage in place

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 40. Permits To Work - General, Integrated & Stepladder - (R945, R946, R947) <br>Are PTW forms being completed and issued?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 41. First Aid - SM Qualified, Signage, FA Kit, Emergency Proceedures - PCMP Section 6 <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 42. Monitor and Control - (R933) & Site Rules <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 43. Weekly Returns/ Weekly Diary -(R980, R960, R931, R858, R936 & R136) <br>Are these being completed and up to date?

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

  • 44. Specialist / High Risk Operations - (R952) <br> <br> <br> <br>

  • Photo of area to be addressed

  • Indicate what corrective action is required / requested.

  • General Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.