Isolation and Lockout Audit
General Requirements
-
Work Area
-
Scope of Work - brief description of work task
-
Isolation Officer
-
Name(s) of Worker(s) performing the task
Worker
-
Name:
-
Has a risk assessment been completed for this task?
-
What Type of Risk Assessment?
-
Details
-
Line of Fire - has the workplace been assessed for potential "line of fire" hazards during the work task in the event of a release of stored energy? e.g. Rigging, Piping, Gravity etc.
-
Have necessary Control Measures been put in place to inform and control people or equipment entering the work area? (e.g. Barricade Tape & Tag)
Isolation Procedure
-
Does the lockout involve Mobile Equipment?
-
Is the equipment parked fundamentally stable prior to starting work?
-
Has the Master Switch been locked out by the Isolation Officer?
-
Has the Tag been filled out with all required information?
-
Have hydraulic and pneumatic systems been bled down of residual stored energy?
-
Are Booms, Blades , Buckets, Hoods, Boxes or other suspended attachments pinned, blocked or otherwise supported by stationary jacks to prevent accidental movement?
-
Does the Isolation involve Electrical Equipment?
-
Regulation 10.21 (3) Electrically powered equipment or systems must have the main power source feeding the equipment/system disconnected, locked out and tagged out AND where necessary, the upstream and downstream equipment shall be disconnected, locked out and tagged.
-
Have the RED lock(s) of the Isolation Officer been applied?
-
Has the BLUE lock(s) of the worker(s) been applied
-
Has a YELLOW Service lock(s) been applied?
-
Reason for Service Lock application
-
Do all workers participating in the job have their personal locks applied?
-
Are the KEYS for all applied locks securely controlled by the owner?
-
Has a RED Isolation Officer Tag been applied on all lockout points and filled out correctly?
-
Has a BLUE Personal Lockout Tag been applied on all lockout points and filled out correctly?
-
Has an OUT OF SERVICE tag been applied where necessary?
-
Have all workers been clearly identified in the Log Book and signed in correctly?
-
Has a Matrix been filled out for Multiple Point Isolation?
-
Has a "Bump Test' been confirmed?
-
Has Maintenance Mode been confirmed?
-
Have all Isolation points identified on the matrix been physically locked out?
-
Do Equipment identification numbers on the matrix match the lockout points?
-
Has the Matrix been filled out as required?
-
Is a Lock Box being used for 4 or more points of isolation?
-
Lock Box has been locked with all keys inside?
-
A copy of the matrix is INSIDE the Lock Box?
-
A copy of the matrix remains OUTSIDE the lock box?
-
Regulation 10.21 (6)
All stored energy shall be safely released or contained.
Pipelines shall be blanked where valves could leak. This includes water, steam, compressed air or any other substance
All loose or freely moveable equipment must be secured against unintended movement. -
List any non-electrical isolation methods.
- N/A
- Valve
- Chain
- Pin
- Block & Bleed
- Other
-
Details
-
Has a Zero-Energy State been achieved and proven for all non-electrical isolation points?
-