Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel interviewed and accompanying auditor
Procedure
-
Is there a written and approved site procedure for isolation and lockout?
-
Has it been communicated to the employees and contractors?
Permits
-
Has a permit to work been obtained prior to commencing work!
-
Has a risk assessment been conducted and approved?
-
Has the Maintenace Manager appointed in writing competent persons as isolation and lockout permit issuers?
-
Has an isolation and lockout permit been issued prior to commencement of work and is this readily available?
-
Have employees required to conduct lock out and tag out been trained?
Isolation
-
Are danger tags and locks used for lockout?
-
Does the electrician do the primary lockout and indicate with a personal danger tag what equipment has been locked out?
-
Has every employee required to work on the isolated equipment been issued with a lock (either a personal lock or a lock issued on a list with the permit with name and number of the lock and signature)?
-
Has every employee working on the equipment locked out?
-
Are personal locks removed when workers leave the work site even if the work is not yet completed?
Discipline
-
Is disciplinary action taken when somebody destroys or removes a lock that is not theirs?