Activity/Task Inspection & Test Checklist Bored Peir
-
Project Description
-
Location
-
Company
-
Principal Contractors Details
-
Date
INSPECTION ACTIVITY BORED PEIR
-
1 – Foundation base free of loose materials and water
-
2 – Foundation Geotechnical engineer Verified shear and strength
-
3 - Foundation hole Diameter and depth
-
4 - Formwork (Above Ground) Braces and rigid
-
5 - Formwork (Above Ground) Earth Recesses and chamfers
-
6 – Reinforcement 50mm cover – Top, side & Bottom
-
7 – Reinforcement Fast Wheel Chairs at side of cage
-
8 – Reinforcement Bar size and spacing
-
9 – Reinforcement Lig size and spacing
-
10 – Reinforcement Clean and free of debris and rust
-
11– Reinforcement Dowels Size, spacing, sleeve
-
12 – Reinforcement Dowels Embedment, epoxy Type
-
13 – HD Bolts and Ferrules Size and Length
-
14 - HD Bolts and Ferrules Template Top and Bottom
-
15 - HD Bolts and Ferrules – Ferrules and bars – galvanized
-
16 - HD Bolts and Ferrules Templates secured
-
17 - HD Bolts and Ferrules Earth crimped to HD Bolt
-
18 – Construction Concrete Delivery Docked – N25
-
19 – Construction Mechanical Vibration
-
20 – Construction Finished confirmed (Broom, steel trowel, etc.)
-
21 – Certification Contacted certifying engineer
EVIDENCE
-
IMAGE UPLOAD
VERIFICATION
-
Deficiencies Identified: (Select one)
-
Comments
-
Comments
-
Acceptance - I hereby confirm the work had been completed in accordance with contract specified/referenced drawings, technical specifications, and standards
-
Supervisors Name
-
Signature