ITC FOOTING / TX PLINTH PRE-POUR INSPECTION
-
Project Description
-
Location
-
Company
-
Principal Contractors Details
-
Date
INSPECTION ACTIVITY
-
1 – Foundation Firm under foot
-
2 – Foundation Fee of Loose Materials and Water
-
3 - Foundation Compaction/Bearing Test Requirements
-
4 - Dimensions Set Out, RL Top of Footing
-
5 - Dimensions Overall Width, Breadth and Depth
-
6 – Formwork - Braced and Rigid
-
7 – Formwork - Earth Recesses and Chamfers
-
8 – Formwork Sand Layer/Polythene layer
-
9 – Formwork Polythene Taped at joints
-
10 – Formwork Concrete Class (Plinth -2, Footing - 3)
-
11 – Reinforcement Cover Top, Side, Bottom, Penetrations
-
12 – Reinforcement Top Layer - Size, spacing
-
13 – Reinforcement Bottom Layer - Size, Spacings
-
14 - Reinforcement Distance between layers
-
15 - Reinforcement Trimmer Bars - Size, Orientation Length
-
16 - Reinforcement Laps - Mesh and Bars
-
17 - Reinforcement Chair spacings
-
18 – Reinforcement Clean and free of debris and rust
-
19 – Reinforcement Sarters - Embedment, Epoxy Type
-
20 – Reinforcement Dowels - Size, spacing, sleeves
-
21 – Reinforcement Dowels Embedment, Projection, secure
-
22 - HD Bolts Location, Embedment, Projection, cover
-
23 - HD Bolts Tape Over threads, Galvanised
-
24 - Penetrations Conduits - Size, location, cover
-
25 - Penetrations Additional bars around penetrations
-
26 - Penetrations Additional bars beside cut reinforcement
-
27 - Construction - Curing method Approved
-
28 - Construction Mechanical Vibration x 2 on site.
-
29 - Construction - Finish confirmed (Broom, steel trowel, etc)
-
30 - Construction - Strenght, slump and Testing Requirements
-
31 - Certification Contacted Certifying Engineer
EVIDENCE
-
32- Photos Taken
VERIFICATION
-
Acceptance - I hereby confirm the work had been completed in accordance with contract specified/referenced drawings, technical specifications, and standards
-
Supervisors Name
-
Signature