Aspect evaluation assessment
-
Name
-
Date
-
Location
-
Site
-
Contractors Details
-
Work Action Description
GENERAL INSPECTION TEST CHECKLIST
CLEARING & GRUBBING
-
Site
-
DESCRIPTION
-
Pre-clear visual inspection
-
Ensure Flora and Fauna spotter is present during clearing operations
-
NAME
-
Implement temporary Erosion & Sediment controls as required
-
Check permanent & temporary boundaries marks have not been disturbed
-
Dust suppression in place water delivery trucks in use
-
Safety construction signage and fencing stepup
-
Cleared of all vegetation, refusal, and obstructions down to natural surface
-
Disposal or placement of Cleared & Grubbed Material
-
Comments
-
Evidence
GENERAL DETAIL CAPTURE
-
Length
-
Width
-
Depth
-
Reinforcement
-
Evidence
FOUNDATION PAD
-
Detail Checked - Foundation type and depth confirmed as per plans
-
Conducts in place and position correctly
-
Reinforcement Description -
-
Check location true - permanent & temporary survey marks
-
Pre-pour visual inspection
- Diameter and depth checked
- Clean, De-watered, free of loose and soft material verticality is acceptable, no collapse or instability, no loose material at the bottom.
- Reinforcing to be placed, tied, and supported to ensure that it is fully covered by the concrete to the required distance.
-
Comments
-
Evidence
BORED PEIR
-
Detail Checked - Foundation type and depth confirmed as per plans
-
Final drilled depth from ground level:
-
Size (DIA) -
-
Reinforcement Description -
-
Safety
- Diameter and depth checked
- Clean, De-watered, free of loose and soft material verticality is acceptable, no collapse or instability, no loose material at the bottom.
- Reinforcing to be placed, tied, and supported to ensure that it is fully covered by the concrete to the required distance.
-
Pre-pour visual inspection
- Diameter and depth checked
- Clean, De-watered, free of loose and soft material verticality is acceptable, no collapse or instability, no loose material at the bottom.
- Reinforcing to be placed, tied, and supported to ensure that it is fully covered by the concrete to the required distance.
-
Check location true - permanent & temporary survey marks
-
Establish safety zones and restrict unauthorized access
-
Spoil spread around site
-
Comments
-
Evidence
Verification & Acceptance
-
Name
-
Signature
-
Additional evidence