Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Zone
VERIFICATION:
-
Construction drawings approved for use
- Yes
- No
- N/A
- Re-Inspect OK
-
DCDA Required
- Yes
- No
- N/A
- Re-Inspect OK
-
Materials approved for use
- Yes
- No
- N/A
- Re-Inspect OK
SETOUT
-
Location as per drawing
- Yes
- No
- N/A
- Re-Inspect OK
-
Pipe work is in correct location
- Yes
- No
- N/A
- Re-Inspect OK
INSTALLATION:
-
Installed as per drawing
- Yes
- No
- N/A
- Re-Inspect OK
-
Installed at correct height
- Yes
- No
- N/A
- Re-Inspect OK
-
Pipe bracketed as required
- Yes
- No
- N/A
- Re-Inspect OK
-
All pipework completed in area
- Yes
- No
- N/A
- Re-Inspect OK
-
Storz connectors fitted
- Yes
- No
- N/A
- Re-Inspect OK
-
All valves locked with 003 locks
- Yes
- No
- N/A
- Re-Inspect OK
TESTING:
-
All pipe work pressure tested
- Yes
- No
- N/A
- Re-Inspect OK
-
Pipe work checked for leaks
- Yes
- No
- N/A
- Re-Inspect OK
-
Pipe commissioned ready for use
- Yes
- No
- N/A
- Re-Inspect OK
DCVA
-
Installed with minimum clearance of 450mm beneath
- Yes
- No
- N/A
- Re-Inspect OK
-
Isolation valves installed as required
- Yes
- No
- N/A
- Re-Inspect OK
-
Tested and report submitted to Sydney water
- Yes
- No
- N/A
- Re-Inspect OK
Comments, Date and Signature
-
Comments
Checked By
-
Signature
-
Date
Reviewed By
-
Signature
-
Date