Title Page

  • Site conducted

  • ASSET ID

Property Details

  • Unit/Number/Building

  • Street Name

  • Suburb

  • Postcode

  • LANDING VALVE INFO
  • Does the Hydrant Landing Valve appear to be in good condition and replaced within the past 12 months?

  • NEW BARCODE

  • BEFORE PHOTOS

  • AFTER PHOTOS

  • INSTALLATION DATE

  • MANUFACTURER

  • MANUFACTURER

  • Photo of AS1851 Compliance Tag Stamped

  • Photo of New Barcode Installed

  • Are there any non-compliant / defective items associated to the accessibility or compliance of the hydrant landing valves?

  • Comments

VENTIA 5 YEARLY HYDRANT LANDING VALVE REPLACEMENT

Completion Date:

  • Date:

Signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.