Title Page
-
Site conducted
-
Project
-
Conducted on
-
Prepared by
-
Location
-
Zone
-
Level
VERIFICATION:
-
Construction drawings approved for use
-
Drawing Number
-
Revision Number
-
Pipe Material
-
Materials approved for use
PIPE WORK:
-
Pipe installed as per drawing
-
Pipe bracketed as required. 100mm-1.2M Max
-
Pipework installed with correct fall 1:60 min
-
All pipework completed in the area
-
Pipe size used
COMMISSIONING:
-
All pipe work pressure checked for leaks
-
All debris flushed from the system
-
All air bled from the system
COMMENTS
-
Comments:
-
Photos of works
-
Checked By:
-
Date: