Title Page

  • Site conducted

  • Project

  • Conducted on

  • Prepared by

  • Location

  • Zone

VERIFICATION:

  • Construction drawings approved for use

  • Drawing Number:

  • Revision Number:

  • Pipe Material

  • Materials approved for use

EXCAVATION :

  • Marked out as per drawing

  • Excavation to correct depth

PIPE WORK:

  • Pipe install as per drawing

  • Are alterations to design required

  • Alterations approved by builder/designer

  • Alterations marked clearly on Asbuilt drawing

  • Pipe install min 600mm depth

  • All pipework completed in the area

  • Pipe size used

PITS:

  • Pit install as per drawing

  • Pit installed in correct location

  • Pit installed at correct R.L

  • Pit installed parallel with building

  • Inlets and outlets correctly sparged

BACKFILL

  • 10mm Agg or bedding sand around pipe

  • Backfilling Trench with dirt

  • Compaction of back fill material

TEES / BRANCHES / JUNCTIONS

  • Install as per drawing

  • Install in correct location

TRENCH COMPACTION

  • Trench compactor used

  • Trench compacted in 150mm layers

  • Compaction testing required and under taken

REINSTATMENT OF FINNISHED SURFACE

  • Grass areas repaired

  • Concrete areas repaired

  • Asphalt areas repaired

COMMISSIONING

  • All debris removed from pits

  • All grates installed

  • All pipe work flushed and free from debris

  • CCTV inspection of new pipe work

COMMENTS

  • Comments:

DATE and SIGNATURE

  • Checked By:

  • Date:

  • Reviewed By:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.