Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Do materials meet relevant standards and hydraulic engineer's specification? <br>
-
Has sewer and rough in layout been checked against architectural drawings and hydraulic drawings?
-
Revision Number of plans
-
Do all pipes,fittings and jointing methods meet relevant standards or hydraulic engineers specifications?
-
Have all clips, saddles, hangers been placed at correct intervals as per relevant standards, hydraulic engineers or manufacturers specification?
-
Have all inspection openings, expansion joints been placed at correct intervals? <br>
-
Have all waste points, lugged elbows, mixers,in wall cisterns and support noggins been placed at correct heights and depths?
-
Have all cold,hot,hot return, rainwater lines, hot water locations and solar panel locations been ran as per hydraulic engineers drawings?
-
Have all vents been brought through ceiling or roof?
-
Have all leak control flanges been installed?
-
Have all pipes been lagged according to relevant standards or hydraulic engineers specifications?
-
Have all pipes penetrating through fire rated walls, had fire collars or fire caulking placed around them?
-
Have all water lines and sewer drain been tested?
-
Inspection/Audit/Observation/Discussion
-
McPherson Representative conducting Inspection
-
Site Supervisors Signature of completion
-
Non Conforming Items
-
Non Conforming items Signed off by Site supervisor
-