Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Do all materials meet AS 3500.1.2015 Section 2 or Hydraulic engineers specification?
-
Have pipe work locations been checked against latest plans?
-
Plan Revision Number?
-
Do all pipe jointing methods meet AS3500.1.2015 Section 2 or manufactures specifications?
-
Have all trenches been back filled with correct bedding materials and compacted to a satisfactory compaction?
-
Has all pipe work been clipped as per AS3500.1.2015 Section 5?
-
Has all pipework been lagged?
-
Inspection/Audit/Observation/Discussion
-
McPherson representative conducting inspection
-
Site supervisor sign off
-
Non Conforming Items
-
Non conforming items signed off by site supervisor
-
Photos of Job