Materials being used do they comply with relevant standards or hydraulic engineers specification?
-
Are the plans the most current revison?
-
Plan Revision Number
-
Have hydraulic drawings been checked against architectural drawings for all locations of waste pipes?
-
Have invert levels been checked?
-
Does bedding material meet relevant standards ,hydraulic engineers or manufacturers specification?
-
Has Sewer been pressure tested?
-
Fall of sewer drain?
-
If less the 1.667% fall who authorised this gradient?
-
Have all measurements of waste's been checked?
-
Have all Inspection shafts, boundary traps been brought to surface to meet relevant standards?
-
Have all trenches been backfilled correctly and achieved satisfactory compaction?
-
If backfill material is used that isn't as specified who authorised this?
-
Signature of person authorising un-specified backfill
-
Inspection/Audit/Observations/Discussion
-
Person conducting inspection
-
Site Supervisor conducting inspection
-
Non-Conforming Items To be rectified
-
Non-Conforming items signed off by supervisor
-