Do all materials meet relevant standards or Hydraulic engineers specifications?
-
Have all hydrant, valves and hose reel locations been checked against latest architectural drawings?
-
Plan Revision number
-
Do all jointing, welding methods meet relevant standards or manufactures specifications?
-
Does all buried pipework have correct back fill material surrounding pipe?
-
Has marking/warning tape been placed over buried pipe work?
-
Has all trenching been compacted to a satisfactory level?
-
Has all pipework been tested to relevant standards?
-
Have all hydrants/hose reels been setup to the correct height above finished floor level?
-
Do all hanging brackets and clip spacing's meet relevant standards or material specification?
-
Do all pipes penetrating fire rated walls/ceilings have fire collars or fire caulking around them?
-
Have all isolation valves been chained and locked according to relevant standards?
-
Inspection/Audit/Observation/Discussion
-
McPherson representative conducting inspection
-
Add signature
-
Non Conforming Items
-
Non conforming items signed of by Site Supervisor
-
Add media