Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Do all roofing/cladding materials meet relevant standards or architectural specifications?

  • Do all gutter supports and roof battens meet relevant standards or material specifications?

  • Have all sumps, downpipes and overflows been placed according to latest architectural drawings?

  • Plan Revision Number

  • Does all sarking/insulation a vapor barrier meet relevant standards or architectural specifications?

  • Do all roof/cladding fixing methods and roof spacers meet relevant standards or manufactures specifications?

  • Have all box gutters,sumps, flashing's and penetrations been sealed correctly?

  • Inspections/Audit/Observation/Discussion

  • McPherson representative conducting inspection

  • Site Supervisor signature of completion

  • Non Conforming Items

  • Non conforming items signed off by site supervisor

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.