Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Do all materials meet relevant standards or Hydraulic Engineers Specifications
-
Have all gas lines been ran according to hydraulic drawings?
-
Plan Revision Number
-
Have all gas lines been tested to relevant standards?
-
Have all trenches been compacted and warning/marking tape placed at correct depth?
-
Have all suspended gas lines been clipped correctly as per relevant standards or manufactures standards?
-
Do all pipes that penetrate through fire rated walls or ceilings have fire collars or fire caulk around them?
-
Inspection/Audit/Observation/Discussion
-
McPherson Representative conducting Inspection
-
Site Supervisor Conducting Inspection
-
Non Conforming Items
-
Non Conforming Items Signed off by Site supervisor
-
Add media