Title Page
-
Site conducted
-
Conducted on
-
Shift
-
Employee Name/ Id
-
JCC Conducted by
-
Location
ROCK BOLT INSTALLATION
Rock Bolt Drilling Operation
-
Are the persons well conversant with rock bolt drilling and safety requirements?
-
Is PPE available in good conditions?
-
Is inspection done at the workplace and documenting it on "Face Diary"?
-
Are ground support consumables available ?
-
Are the ground support consumables present in supported ground?
-
Is Jumbo Operator's Cabin under supported ground(at least 1.5 m back from the last ring of rock bolts)?
-
Is jumbo positioned an equal distance from the sidewalls?
-
Is the Services Equipment for jumbo available?
-
Is there any loose in face,roof and side?
-
Is the loose scaling done upto 30m outbye from face ?
-
Is proper scaling done before rock bolt drilling operation?
-
Is 33mm drill bit available in jumbo?
-
Is marking done on sidewall at specified spacing as per SSR before drilling?
-
Are holes drilled as per the length of Rock Bolt specified in SSR?
Rock Bolt Grouting Operation
-
Are the resin capsules within the expiry date?
-
Is resin insertion tube available in jumbo?
-
Is resin inserted in upright direction?
-
Is rock bolt grouter available in jumbo?
-
Are rockbolts inserted onto boom from safe ground?
-
Is proper churning of resin ensured?
-
Is specified holding time of rock bolts ensured?
-
Is shear pin of nut broken?
-
Are bearing plates held tight against wall?
-
Is relieving rock bolt done if required?
-
Are rock bolts installed upto minimum of 0.6m from face?
Evaluation:
-
Adequacy of SOP
-
Competency of Employee / Operator to follow SOP