Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
2. Safety Responsibilities
-
2a. Please list Project Team and their responsibilities
-
Project Manager
-
Superintendent
-
Safety Manager
-
Safety Carpenter
-
Other
-
2b. Please list the General Foremen on site and their safety responsibilities
-
Carpenter General Foreman
-
Deck Foreman
-
Vertical Foreman (besides core)
-
Core Foreman
-
Carpenter Union Steward
-
Laborer General Foreman?
-
Stripping Foreman
-
Sub Foreman
-
Ground man
-
Deck Laborer
-
Laborer Union steward
-
Safety Laborer
-
Ironworker General Foreman?
-
Deck Foreman (rebar decks)
-
Deck Foreman (PT slabs)
-
Vertical Foreman
-
Core foreman
-
Ironworker Union Steward
-
Safety Ironworker
-
Cement Mason General Foreman?
-
Sub Foreman
-
Cement Mason Union Steward
-
Safety Cement Mason
-
Engineer Foreman
-
Safety Tech. Engineer
-
Operators
-
Crane Operators
-
Oiler
-
Crane Operator
-
Oiler
-
Pump Operator
-
Placing Boom Operator
-
2c. Are there any site safety contractual requirements above and beyond McHugh's requirements? If so pease list
-
Please list
-
2d. List any additional Safety Comments
3. Emergency Action Plans
-
3a. Have you designated an emergency evacuation meeting area?
-
Please enter the location
-
3b. Severe Weather-preventative measures?
-
List any site specific potential safety hazards
-
3c. Please list emergency contact numbers of Project Team.
-
Home Phone Number
-
Cellular Phone Number
-
Other Phone Number
-
3d. Please list the operational plans that will be provided for the project.
-
Locations of Safety straps
-
Location plan for fire extinguishers
-
Location plan of exits
-
Location Plan of other (please list)
4. Training and Education, New Employee Orientation
-
4a. Please ensure the following requirements are met prior to employee beginning work
-
Fit for duty for new employees
-
Drug and alcohol test
-
Safety Orientation
-
Proper documentation
-
Copy of special certifications, if applicable
-
4b. Is there anyone on site that is trained in CPR or First Aid? If not, there should be an effort made to provide training
-
Please list employees who are trained in CPR or First Aid
-
Please list employees you recommend to be trained in CPR or First Aid
-
Please list employees you recommend to be trained in CPR or First Aid
-
4c. Please list any planned training that will take place
-
4d. Is there any task specific training that will be necessary for this project?
-
Confined Space? If so please explain
-
Trenching? If so, please explain
-
Post tensioned slabs/beams? If so, please explain
-
High Decks? If so, please explain
-
Any other task specific training that will be necessary for this project?
5. Pre-task Planning and Job Hazard Analysis
-
5a. Please list any areas that need extensive long term planning with pre-construction safety meeting required
-
Confined Space?
-
Please list Responsible person
-
Please select date of scheduled work
-
Please enter the meeting date
-
Trenching?
-
Please list Responsible person
-
Please select date of scheduled work
-
Please enter the meeting date
-
Post-Tensioning?
-
Please list Responsible person
-
Please select date of scheduled work
-
Please enter the meeting date
-
High Decks?
-
Please list Responsible person
-
Please select date of scheduled work
-
Please enter the meeting date
-
Other?
-
Please list Responsible person
-
Please select date of scheduled work
-
Please enter the meeting date
-
5b. Please list those on your Team who will be performing the Take 5 meetings, and their titiles
6. Safety Inspection Procedures
-
6a. Please list inspection procedures besides the regular safety audits that will be performed
-
Please list the plans that will be provided regulating fire extinguishers
-
Please list the plans that will be provided for checking PPE
-
6b. Please list whom will perform the regular Safety Audits
-
6c. What processes are in place to make employees aware of potential hazards?
-
Site Orientation?
-
JHAs?
-
Take 5 meetings?
-
Weekly coordination meetings?
-
Tool box talks?
-
Other (Please list)?
7. Personal Protective Equipment
-
7a. Are there any Protective Equipment requirements above and beyond the standard?
-
Please list
-
7b. Is there any special equipment required for the project?
-
Please list
-
7c. Has the project required PPE signage locations been determined?
-
Please list signage and locations
8. Respiratory Protection Program
-
8a. Employees on site using respirators?
-
8b. Employees Medical and Fit tested?
-
8c. Records on site?
-
8d. Respirators in sealed container when not in use?
-
8e. Only McHugh Construction respirators used on site?
-
8f. Confined spaces?
-
8g. Hazardous gases/dust?
-
8h. Have the Silica Hazard signs en posted if applicable?
9. Fire Prevention and Protection
-
9a. Will flammables be stored on site?
-
9b. Are flammables located in a safe area, away from sparks, flames and traffic?
-
9c. Are flammables stored in an enclosure that is labeled?
-
9d. Will torches be used on site?
-
9e. Do the gauges have flash back arrestors?
-
9f. Required separation and storage area's provided for oxygen and acetylene?
-
9g. Storage area's labeled and warning signs posted?
-
9h. Has the local Fire Dept. been notified of the type of construction taking place?
-
9i. Has a drawing of the site and hazardous area's been provided to the Fire Dept.?
-
9j. Evacuation Area designated?
-
9k. Special hot work needs, neighboring fuel storage/flammables?
-
9l. Deck heaters being used on site?
-
9m. Extra fire extinguishers placed near heated areas?
-
9n. Has the appropriate number of fire extinguishers and signage been addressed for the project formwork?
10. Fall Prevention and Protection
-
10a. Decking over 10'?
-
10b. Deck monitor on site?
-
10c. Full time tie off on floors over 10'?
-
10d. Briefings/Safety Meetings prior to 10'+ decking operation?
-
10e. Procedures in place for stripping elevated decks - scissor lifts, boom lifts, ladders, tie off straps?
-
10f. Scaffolds on site?
-
10g. Employee's trained and proof of training on site?
-
10h. Type of exterior fall protection - cables, wood rails, mesh?
-
10i. Boom lifts being used on site?
-
10j. Scissor lifts used on site?
-
10k. Employees trained in use of boom and scissor lifts?
-
10l. Deck monitor on site?
-
10m. Plan for full time tie off on floors over 10' in elevation?
-
10n. Life lines, retractables, d-ring anchors and column straps inspected prior to use?
-
10o. Will the control zone and 100% tie-off signs be posted?
11. Housekeeping and Material Storage
-
11a. All material will be stored to not block aisle ways and passageways, both interior and exterior?
-
11b. All fuel tanks to be properly stored and removed from building ASAP?
-
11c. All work areas to be kept as free of waste materials that may cause tripping, fire, or other hazards?
-
11d. Materials will be stacked, racked, and blocked in such a way as to prevent the accidental displacement or collapse?
-
11e. Nails will be removed from lumber that is to be re-used?
12. Electrical Safety
-
12a. Are all electrical tools protected by Ground Fault Circuit Interrupters (GFCIs)?
-
12b. Will electrical tools be inspected for visible defects daily?
-
12c. Electrical cords will be positioned to not cause tripping hazards?
-
12d. Crane electrical & boxes will be marked with the operating voltage?
-
12e. If temporary generators are used there will be proper ventilation and electrical cords will be checked daily?
-
12f. Will the electrical boxes and disconnects be labelled for the crane?
13. Cranes, Rigging, and Heavy Equipment
-
13a. Type of crane/cranes on site - Hammerhead, luffing boom, crawler, rubber tire mobile.
-
13b. Copy of annual inspections on site?
-
13c. Inspection sheets for each type of crane being used?
-
13d. Procedures in place for swing radius protection for crawler cranes?
-
13e. Communication to Crane operators - radios, hand signals, hardline speaker?
-
13f. Signal and rigging training certification for employees on site?
-
13g. Copy of City of Chicago Crane License if necessary on site?
-
13h. Signal and rigging training certification for employees on site?
-
13i. Will the "Authorized Personnel Only" sign be posted at the bottom of crane ladder?
14. Truck and Auto Fleet Safety
-
14a. List of vehicles used on site available?
-
14b. Copy of Drivers Licenses of employees using vehicles on site?
-
14c. Fire extinguishers and First Aid kits in company vehicles (infrastructure)?
-
14d. Mars lights/ four way flashers required?
15. Confined Space Entry
-
15a. If there will be CSE work, has the CSE procedure been developed by Corporate Safety?
-
15b. Are concrete subcontractors of McHugh planning to use CSE with their work?
-
15c. CSE safety procedures for subs need to be approved by Corporate Safety?
-
15d. Will confined Space sign be posted if applicable?
16. Scaffold, Aerial Lift, and Ladder Safety
-
16a. Are any scaffolds or aerial lifts (scissor or booms) planned to be used for the concrete work?
-
16b. Will there be daily records kept for each days inspection?
-
16c. Will there be training records for each employee that is trained on booms or other?
-
16d. Will there be ladder safety training done and recorded?
17. Trenching and Excavation
-
17a. If trenching is done to do concrete work, have the employees working in the trench been trained and has this training been recorded?
-
17b. Will the excavator be following the McHugh process trench safety?
18. Portland Cement/Concrete Safety
-
18a. Have the employee been trained regarding Cement/Concrete safety?
-
18b. Will employees be wearing proper PPE, fitted masks, and other?
-
18c. Are mask fit test records being kept for each affected employee?
-
18d. Has the "Silica Hazard" signage been posted if applicable?
19. Cable Post Tensioning/Safety Traffic Control
-
19a If there is concrete post tensioning on the project, have the employees been trained?
-
19b. Are the records of the employee training being kept?
-
19c. Has there been a procedure for disposing of the cut-off tails?
-
19d. Has the "Post Tensioning in Progress" signage been posted if applicable?
20. Traffic Control
-
20a. Has the site logistics plan used for the bid been reviewed for more project specific information?
-
20b. Has the site logistics plan included auto, truck, and pedestrian traffic control?
-
20c. If there is specific training for traffic control, like for flaggers, has this training been planned?
-
20d. Has the "Truck Crossing" and "Sidewalk Traffic Control" signage been posted if applicable?
21. Work Over, On, or Near Water
-
21a. will there be any work over, on, or near water?
-
21b. Has there been a JHA for this work item?
-
21c. Has the "Life Jackets Required" signage been posted if applicable?
22. Demolition
-
22a. Will there be any demolition on this project? If yes, describe locations and methods plan.
-
22b. Are existing utilities (gas, water, electric, sewer) anticipated?
-
22c. Hazardous materials (gases, explosives, flammable materials, lead, asbestos)?
-
22d. Testing for hazardous materials?
-
22e. Has the "Demolition Hazard" signage been posted if applicable?
23. Public Protection and Site Security
-
23a Does site logistics plan address public safety?
-
23b. Are noise, vibrations, fumes, dust, falling debris concerns?
-
23c. Will overhead protection canopies be required?
-
23d. Does construction traffic cross pedestrian routes safely?
-
23e. Will perimeter wind screens be needed?
-
23f. Has "Construction Site Public Protection Plan Checklist been reviewed" (ref. Section 23 of Corp. Safety Plan
-
23g. Will Logistics/Site Security plans be included in tool box talks and orientations?
-
23h. Will Logistics/Site Security plans be posted? Where?
-
23i. Have the "Danger Truck Traffic" signs been displayed?
24. Employee Safety Violation and Penalty Program
-
24a. Does this project require stricter standards than what is included in McHugh's corporate plan section 24?
25. Subcontractor Information and Requirements
-
25a. Will there be any subcontractors working for McHugh on this project?
-
25b. Does their contract include safety requirements and schedule of violation fines?
-
25c. Are there any special job site requirements for this project and are they included in their subcontract? i.e. no smoking, 100% tie-off...
-
25d. Is this an OCIP or CCIP job? If so, do we have a copy of the OCIP/CCIP Plan Requirements?
26. Substance Abuse and recovery Program
-
26a. Does this project require stricter standards than what is included in McHugh's corporate plan section 26?
27. Blood Borne Pathogens Information
28. Accidental
-
28a. Has the person been assigned that will lead all accident investigations?
-
28b. Are there any reports or procedures required for this project different from what is in McHugh's Corporate Plan section 28?
29. Sexual Harassment and Unlawful Acts Policy
-
29a. Does this project require stricter standards than what is included in McHugh's corporate plan section 29?
-
29b. Where will McHugh Hotline posters be displayed?
30. OSHA Inspections
-
30a. Are there any procedures required for this project different from what is in McHugh's Corporate Plan section 30?
31. Crisis Management Plan
-
31a. Are there any procedures required for this project different from what is in McHugh's Corporate Plan section 31?
-
Sign off (Print Name)
-
Signature
-
Title