Title Page

  • Site

  • Conducted on

  • Prepared by

  • Location
  • Local DNO Licence Area

  • DNO Substation ID

Description of Work Carried Out

General Periodic Inspection

  • Thermographic Inspection of the installation

  • Housekeeping within protection and control buildings

  • General Visual inspection of access and perimeter compound.

  • Inspection of state of oxidation and general painting of equipment.

  • Current and voltage transformers
  • Inspection of primary and secondary earth connections

  • Thermographic general inspection of transformer

  • Power & Auxiliary Transformers
  • Transformer Description

  • Transformer Serial Number

  • Make/Model

  • Number of Tap Change operations

  • Inspection of local temperatures, earthing connections, bushing, abnormal sounds

  • Inspection of general oil level and filters

  • Visual Inspection of general equipment (Buchholz, oil level, thermal image)

  • Thermographic analysis of Bushings connections, auxiliary tanks, Silica-gel breathings, etc.

  • Oil Sample taken

  • Furan Analysis

  • Replacement of Silica Gel and Oil filter

  • Indication check

  • General Transformer Condition Check/Paintwork

  • Disconnectors and Motor Controls
  • Inspection of earthing connections

  • Number of Operations

  • Statius Indicator

  • Inspection of Auxiliary Switches, local and remote signalling

  • On load Thermographic inspection

  • Heaters inspections and test

  • Circuit Breakers and Switchgear Identification
  • Type

  • Make

  • Model

  • Serial Number

  • Inspection of earthing connections

  • Inspection vents entries, heating and ventilation

  • Status Indicator/Mimic Condition

  • Condition of Paintwork

  • Oil/SF6 Levels within correct limits

  • Additional Checks
  • Test transformer fans and pumps

  • Test Water Pump System if applicable

  • Condition of flood defence system

  • Run 132-33KV Transformer Auxiliary cooling up to<br>confirm correct operation

  • Test heating working correct within Auxiliary control<br>cabinet and Tap Changer control cabinet

  • Check SF6 Gas pressure on switchgear

  • Check Dehumidifiers / Air condition /Heating / pumps<br>within the Substation

  • Visual inspection of 132kV Lines/Apparatus/disconnectors.

  • Visual inspection of compound bonding/Earthing to<br>apparatus and continuity

  • Check and record any recent protection operations and<br>reset relays

Inspection Summary

  • Oil Samples Taken Y/N

  • Why was sample not taken

  • Silica Gel and Oil filter condition

  • Has Silica Gel Been Replaced

  • Comments:

Completion

  • Remedial Works Completed

  • Safety Concerns

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.