Risk Assessment
Details
-
Address
-
Customer Name
Identify hazards associated with works undertaken
-
Drilling
-
Cutting/Grinding
-
Dust
-
Lifting/Carrying
-
Handling Waste
-
Hot Works
-
Cellar Access
-
Floor Access
-
Loft Access
-
Boiler into Loft
-
Use of Ladders
-
Use of Stepladder
-
Loose Carpets
-
Asbestos
-
Access/Egress
-
Roof Works
-
Confrontation
-
Unsafe Structure
-
Poor Hygiene
-
Weather
Controls Required to Control Hazards Above
-
Ear Muffs/Plugs
-
Face Mask P3
-
Gloves
-
Safety Footwear
-
Harness/Lanyard
-
Lifting Straps
-
Check Power Tools
-
Eye Protection
-
Safety Helmet
-
Ladder Anti Slip
-
Ladder Stand Off
-
Remove Hazards
-
Loft Boarding
-
RCD
-
A Frames
-
Barrier Tape
-
Rigid Barriers
-
Sack Barrow
-
Tidy Work Areas
-
Lighting Unit
-
Hi-Vis Clothing
-
Fire Checks
-
Cool Gel
-
Heat Mats
-
Fire Extinguisher
-
2 Person Lift
-
Buddy Assist
-
Addition Works Carried Out
-
Is Buddy Assist Needed
-
Called for buddy assist
-
Contact Electrician to Wire System
Signature
-
Surveyor Signature
Technical Survey
Customer Property & Benefits
-
Property Type
-
Tenure
-
Benefit Type
-
Photo Evidence of Benefits (All Pages)
-
If 'other' provide details here
Existing Boiler
-
Heating System Type
-
Location Of Boiler
-
Make and Model of Existing Gas Boiler (inc GC if accessible)
-
Flue Type
-
Asbestos Removal Needed
-
Complete Asbestos Section
-
Photo Evidence of Boiler
New Boiler
-
Recommend Make and Model
-
Boiler Type
-
Shower Compatible
-
Flow Sufficient
-
New Flue Type
-
Vertical Flashing
-
Plume Kit Needed?
-
Terminal Guard Needed?
-
Rear Flue Option (on selected boilers)
Gas Supply
-
Is Gas Supply Adequate
-
Photo of Gas Route
Condensate
-
Termination
-
Termination
-
Termination
-
Condensate Pump Needed?
-
Photo of Condensate Termination Point
Making Good
-
Brick Up and Plaster Needed
-
Comments
-
Photos of Bricks needed and Location of Works
-
High Level Making Good Needed?
-
Comments
Electrics
-
Main Earth Bonding Needed?
-
Comments
-
Fused Spur Needed
-
Comments
Heating Controls
-
Pump Needed?
-
Reason for Replacement (controls to only be replaced if faulty)
-
Photo Evidence
-
Programmer Needed?
-
Reason for Replacement (controls to only be replaced if faulty)
-
Photo Evidence
-
3 Port Valve Needed?
-
Reason for Replacement (controls to only be replaced if faulty)
-
Photo Evidence
-
2 x 2 Port Valve Needed?
-
Reason for Replacement (controls to only be replaced if faulty)
-
Photo Evidence
-
Room Thermostat Needed
-
Reason for Replacement (controls to only be replaced if faulty)
-
Photo Evidence
-
Cylinder Thermostat Needed?
-
Reason for Replacement (controls to only be replaced if faulty)
-
Photo Evidence
-
Cylinder To Be Replaced
-
Reason for Replacement (cylinder to only be replaced if faulty)
-
Photo Evidence
-
TRVs Needed?
-
Addition Notes
CODES
-
Type Of Replacement
- AA
- BB
- CC
- DD
- EE
- FF
- GG
-
Additional Items
- HH
- II
- JJ
- KK
- LL
- MM
- NN
- OO
- SS
- TT
- UU
- VV
Labour Required
-
Number of Engineers
-
Number of Days
Signatures
-
Client Signature
-
Surveyor Signature
Asbestos Risk Survey
Asbestos Details (Address same as front cover)
-
Has the client indicated that there may be asbestos within the property
-
Location
-
Photo of suspect material
-
Is there any reason to suspect asbestos is present within the property?
-
Location
-
Photo of suspect material
Type of Asbestos
-
What type of asbestos is present
- AIB
- Lagging
- Cement Products
- Textured Coating
- Gaskets / Seals
- Floor Coverings
-
Is material in sound condition?
-
Could the location be disturbed/damaged whilst works are been carried out?
-
Type of Asbestos Removal Needed?
- Removal
- Drilling/Cutting
- Sampling/Testing
- Scrape
-
Location of Works needed
-
Photo of Material
Completion
-
Customer Signature
-
Surveyor Signature
Material Ordering Sheet
Address from front cover
-
Boiler Make and Model
-
Code
- AA
- BB
- CC
- DD
- EE
- FF
- GG
Flue
-
Type of Flue
-
Vertical Adaptor
-
Flat Roof Flashing
-
Pitched Roof Flashing
-
1m Extension
-
90 Bends
-
45 Bends
-
Flue Guard
-
1m Extension
-
90 Bend
-
45 Bend
-
Clips
-
Flue Deflector
-
Plume Kit
-
Plume Extension
-
Plume 90 Bend
-
Plume 45 Bend
Controls Danfoss
-
Programmer / Thermostat Needed
-
Time / Temperature Controls Needed
-
Is Zone Control Needed
-
Zone Control
-
Pump Needed
-
Frost Protection Needed?
-
Frost Protection
Cylinder
-
Is Cylinder Needed
-
Size of Cylinder
Condensate Waste Pack
-
Colour of Pipe
-
Condensate Pump Needed
-
Internal Pack Needed
-
External Pack Needed
-
Soak away and Chippings
Additional Extras
-
Shock Arrestor (For when Combi and Water Meter Present)
-
15mm Double Check Valve (for shock Arrestor)
-
Pressure Relief Kit
-
Filling Loop with Easy Turn Valves
-
15mm TRVs
-
15mm Lock Shield Valves
-
MagnaClean Micropack (ECO Only)
-
Adey MC1 Central Heating Protector
-
Adey MC3 Central Heating Cleaner
-
MagnaClean Test Pack
Fittings Pack
-
JES Fittings Pack
-
Additional Pipework
- 15mm
- 22mm
Radiators
-
Radiators Needed?
-
Size of Radiators Needed
Making Good
-
Block
-
Sand and Cement
-
Plaster