A: GENERAL
-
Current OHS&E Policy & Management Plan available and Safety Co-ordination Plan on site.
-
Copies of Acts, Regulations, Codes of Practice / Compliance available on site
-
Emergency Phone Nos / Evacuation Plan displayed<br>
-
Emergency Procedures in place<br>
-
Warning horn or other method of evacuation notification<br>
-
Emergency evacuation trials conducted. First 3 then every 6 months<br>
-
Public Safety – hoarding, barricades, fences, lighting, signs <br>
-
Fire extinguisher in office and adequate distribution of extinguishers around the site<br>
-
Extinguishers test & tag correctly. Procedure in place<br>
-
Comments:
B: SITE SETUP AND ACCESS
-
Safe access throughout the work site. E.g. Crushed rock walkways
-
Visitor sign in book / sign. Being utilised. Sign directing to Office<br>
-
Work site clean and tidy. Rubbish regularly removed from site
-
Overhead / underground electrical & services considered (dial before you dig, as-built plans, etc)<br>
-
Is a traffic management plan in place / required
-
Designated storage area for materials / equipment
-
Comments:
C: AMENITIES - LUNCH & CHANGE FACILITIES
-
Amenities in clean condition
-
Separate washing water / cold water - drinking facilities
-
Ventilation / air-conditioning / heating (tagged)
-
Seating adequate
-
Tables - laminex / vinyl. Flooring – vinyl
-
Food warmer / boiler unit / refrigerator. All clean
-
No smoking signs and noticeboard (minimum contents)
-
Current Safety Walk, Toolbox and OHS&E Committee minutes (if applicable) sighted and displayed on noticeboard
-
Garbage bins with lids and liners
-
Comments:
D: AMENITIES - SANITARY FACILITIES
-
Toilets clean
-
Adequate number of toilets. Females considered
-
Soap / paper towel provided
-
No smoking signs / toilet roll holders / toilet paper in toilets
-
Garbage bins with lids & liners
-
Comments:
E: FIRST AID / INCIDENTS
-
First Aid Kit maintained and stocked as required
-
Lighting - natural / artificial with guards
-
Hot and cold water available
-
Ventilation / air-conditioning / heating (tagged)<br>
-
Flooring – vinyl / no smoking sign
-
Garbage bins with lids and liners / emptied
-
Comments:
F: PROTECTIVE EQUIPMENT
-
Visitor PPE available
-
Safety signs (eg hard hats, vests, eye, ear, HAZCHEM, etc.)
-
Hard hats (as required) and safety footwear being worn
-
High visibility clothing being worn
-
Respiratory protection available (being worn when required)
-
Eye protection available (being worn when required)
-
Hearing protective devices (being worn when required)
-
Sun cream available (being worn when required)
-
Comments:
G: REGISTERS / PAPERWORK
-
Register – electrical tools – testing and tagging
-
Register – induction training
-
Register – incidents and injuries
-
Register – plant and equipment
-
Register – hazardous substances
-
Register – Material Safety Data Sheets (MSDS)
-
Comments:
H: SAFE WORK METHOD STATEMENTS
-
Trade: SWMS sighted: Bricklayer
-
Trade: SWMS sighted: Brick-cleaner
-
Trade: SWMS sighted: Electrician
-
Trade: SWMS sighted: Framer
-
Trade: SWMS sighted: Plumber
-
Trade: SWMS sighted: Brick cutter
-
SWMS - Review with Form 073
-
Manual Handling Procedures Observed
-
Comments:
I: WORKS AREA / ENVIRONMENT - HAZARDOUS CHEMICALS & DUST / FIBERS
-
External dust control (water cart / sweeper) and / or internal dust control (clean) as required
-
Safe removal and control of asbestos / lead materials
-
MDF and cement fibre (ventilated cutting room / isolated area)
-
<br>Hot Works Permits - Form 029
-
Hazardous and dangerous substances and good stored appropriately
-
Comments:
D: ELECTRICAL
-
Temporary wiring labelled as ‘Temporary'
-
Temporary boards, padlocked, ELCB fitted, fixed down. RCDs are trip tested, tagged and results. Including site sheds
-
Temporary safety lighting to work areas (caged if low height)
-
Leads stands or insulated hooks in use
-
Power extension leads tested and tagged and in good condition
-
Power tools tested and tagged and in good condition
-
Monthly test / tag RCD protected multi plug portable outlet devices used safely and appropriately
-
Procedures in place to identify and control risk of live electrical cables in all work areas, eg as-built plans, dial before you dig, tiger tails, etc
-
Comments:
E: HEIGHT SAFETY: BARRICADE / HANDRAIL / SCAFFOLD / WORK ON ROOFS / FORM WORK
-
Roof access stair tower is provided
-
Roof guard rail
-
All fall hazards on roofs have been identified / controlled (eg edge, penetrations, fragile roof material and skylights)
-
Fall hazards on any location over 2m are controlled
-
Upper level deck has guard rail protection and safe access
-
Upper level checklist completed - Form 081
-
Barricading / hand railing to stairs, guard railing to voids, riser shafts, lift wells and other areas above 2m high
-
Are all ladders industrial rated
-
Access ladders secured top and bottom
-
Ladders extended 0.9m above step off / side step off ladder<br>
-
All scaffolding conforms to requirements, eg ticketed and certificate of completion
-
Mobile scaffolding complete to manufacturer’s requirements
-
Correct selection , application and use of individual fall protection equipment
-
Protection against falling objects
-
Comments:
F: PLANT & EQUIPMENT (CRANE, BOOM, EARTH MOVING) & PRECAST - TILT UP PANEL
-
Equipment Operator 1 Type, Name & License Details
-
Equipment Operator 2 Type, Name & License Details
-
Equipment Operator 3 Type, Name & License Details
-
Equipment Operator 4 Type, Name & License Details
-
Service record and daily inspection log / visual inspection
-
Correct separation of public / workers and plant
-
Plant and equipment being operated properly
-
Rollover protection and fallout protection provided on plant
-
PPE being worn
-
Surrounding area / workers protected from falling object / risk
-
Firm stable ground for plant and equipment use
-
Power line hazard (Power Authority / rules in use)
-
Bunting required for outriggers
-
Documentation compliance for precast or tilt up concrete panel erection
-
Detailed safe work method statements for precast or tilt up panel
-
Comments:
G: EXCAVATION & TRENCHING WORK & CONCRETE CUTTING / CORING WORK
-
Existing in ground services Info, Dial B4 U Dig Info / As-built plans, cable pipe locater (and hand digging as required) to locate services
-
Excavations over 1.5m shored, benched, bunting
-
Safe entry / exit from excavations
-
Competent person on site if excavation over 1.5m deep
-
Copy of WorkSafe Notification (if required) on site
-
Starter bars / star pickets have protective caps
-
Penetrations / holes / trenches have adequate barricades / signs
-
Comments: