Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Drywall touch up
-
All walls sanded smooth?
-
Walls free of dings or damage?
-
Pics of trades work
Paint
-
Pic of trades work
-
All walls, ceilings, and trim/doors have three coats?
-
All trim/ drywall joints are caulked and painted?
-
Is the paint clean and free of smudges or defects
-
-
Have any paint drops or trash been left behind?
Kitchen
-
Are cabinets properly installed per plans?
-
-
Do doors line up and operate smoothly? Is all hardware installed?
Countertops
-
Are countertops installed, caulked and free from damage?
Plumbing
-
Are all sinks, faucets, toilets, bath and shower trims installed and operating properly? Free from damage?
-
Does the kitchen disposal work properly
-
Is there hot water at all valves as required?
HVAC
-
Is the hVAC system working properly? Heat, cool, fan functions work.
-
Is the Thermostat installed level and all functions working?
Electrical
-
Are all devices installed and working, receptacles, switches, lights and panel cover?
-
Do GFI's function properly?
-
Is all low voltage wiring completed and secure?
Appliances
-
Are all appliance installed and operating properly? Microwave, refrigerator, dishwasher, range, disposal as required?
-
Are all appliances clean and free from packing material?
Flooring
-
Are floors clean and waxed?
Door hardware
-
Is all door hardware, knobs, door stops, closers installed and operating properly?