Information
-
Job Number
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Cabling and Termination
-
Has the correct Cable type(s) been used?
-
Has all cable been run properly?
-
Are all terminations solid in their connectors and neat?
-
Have all cables passed the proper testing?
-
Are all cables labeled properly?
-
Any access cable looped and secured properly?
-
Removed any old or unused cable?
Rack
-
Has all equipment been racked properly?
-
Visual inspection, Does the rack look neat and tidy?
-
Is there proper cable management?
-
Has proper labeling been done?
-
Are all blank panels and PVS panels installed?
-
Power supplied to rack is to standard?
-
All rack doors and side panels installed?
Audio
-
Has any speech reinforcement been installed properly?
-
Sound levels checked and peer reviewed?
-
Source levels checked and being distributed properly?
-
Operating levels do not exceed more than 75%
-
Wireless microphone frequencies are set properly to avoid crosstalk?
-
Speaker levels and taps set properly?
Video and Display
-
Is the display focused, centered and evenly distributed?
-
Dose the display have a stable image with no scaling related visual distortion?
-
Camera image and quality?
-
Are camera presets programmed? (if applicable)
-
Any visual damages on display equipment?
-
Is all cabling neatly dressed behind the display?
-
Is the proper resolution set to fit the display?
-
Are all proper video cables connected to the camera/display?
Automation and control functions
-
Correct version of code / programming installed?
-
System on / off shutdown and control functions?
-
Document camera control functions?
-
Projector control functions and baud rate?
-
Monitor control functions?
-
Audio controls and functions?
-
Administration and interface functions?
Networking
-
All network accessible equipment properly configured?
-
All serial controlled equipment properly configured?
-
IP addresses and host names assigned?
-
All network cabling is assigned and properly labeled?
-
Any speed, duplex or firewall issues?
-
Identify proper switch for application. Ie. POE, AVB, FIBER?<br>
Clean up and documentation
-
All floors swept and all trash boxes removed?<br>
-
All tables and racks swept out and cleaned up?
-
All manuals remotes and hardware left with the customer?
-
Any damages or defects are documented about the room?
-
Are all ceiling tiles closed?
-
Any receipts for job documented and attached to job folder?
-
Add signature
-
Select date