Job Completion Checklist
-
Inspector Number
- 120
- 140
- 170
- 190
- 141
-
Date of inspection
Job Details
-
Job Number
-
Tiling Contractor
-
Builder
-
Address
-
Block Inspected
- Top Floor
- Ground Floor
- All
-
Tile Profile
- Marseille
- Vienna
- Roman
- Swiss
- Marseille Grande
- Vienna Ultima
- Monaco Planum
- Visum3
- Roman Curvado
-
Tile Colour
Material Collection
-
Has left over material been collected
-
Have the pallets been collected
Site Photos
-
Front Elevation
-
RHS Elevation
-
Rear Elevation
-
LHS Elevation
-
Spare tiles to be dropped off to site
Product
-
All the product has been installed on the job
-
Is the quality of the product installed acceptable (including colour and variation of colour
-
Are the contact points acceptable
Installation
-
Tiles have been blended from multiple packs to avoid patches
-
Broken jaws and unsightly buckled tiles have been removed
-
Tile contact points and chips greater than a 5 cent coin have been replaced
-
General laying is good and all lines are straight
-
Valley cutting has been string lined and looks visually straight
-
Valley Clips have been placed where required
-
Bedding has been done with a bedding frame and looks visually straight
-
Pointing looks visually smooth with full and correct coverage
-
Hip starters are far enough in to gutter to cover fascia and pointed around
-
No leaching is apparent
-
No hips cuts are dropping and all have been nailed up correctly
-
Apex's have been installed / cut in straight
-
Gables are balanced with even overhangs
-
Short courses are on the same pitch
-
Tiles have correct overhang in to gutters
-
Has sarking been installed to 6m rafter lengths
-
Has sarking been installed under overhanging valleys
-
If full sark, the sark has been turned over at the valleys to not obstruct valley water flow
-
If lower roof, the sarking has been installed 1.8m either side below all DP spreaders
-
Nailing has been completed to AS requirements and work order requirements eg galv nails, additional nailing
-
Lead flashing has been pulled up straight and not dished
-
Roof is water tight including all flashing areas
-
Roof has been cleaned and gutters are clear of any rubbish
Site Conditions
-
Tile and batten waste has been separated and placed in a bin or tidy pile
-
Left over product on pallets have been cleared to the nearest quarter
-
3 clean spare bungs have been placed at the rear of the block and away from rendered walls
-
The site is clear of food waste and rubbish used by the contracting team
-
Site has been left clean and tidy
-
Gutters and eaves are free of damage
Office Actions
-
Above actions do not need to be followed up by Tile Supervisor
-
Builder does not need to be advised of any problems
-
Production does not need to be advised of any problems
-
Touch up to areas as specified below
-
Accessories or finials required
General Roof Comments
-
General Comments regarding roof
-
Tile quality score
- 1
- 2
- 3
- 4
Completion
-
Can contractor be paid 100% for the works as described
This job has been inspected in accordance with the above points and has been deemed to have met the Australian Standards and Company Quality Standards
-
Signature of inspector