Title Page
-
Job Name:
-
Job Number:
-
Job Location:
-
Superintendent Name:
-
Safety Representative:
-
Conducted on
-
Prepared by:
-
Select "Safe", " At Risk", or "N/A" (Not Applicable). If at risk is selected explain why it is at risk in the note section and add a photo if possible.
Fall Protection:
-
Competent Person:
-
Hazard(s)
-
Protection (Guardrail, Personal Fall Arrest System, Hide Covers)
-
Equipment selection/use/training
-
Anchorage/Tie-Off
-
Body Harness and Laynards
Drill Rig(s):
-
Daily Inspection
-
Properly Set Up
-
Operator's Manual
-
Proper Shut Down and Storage
-
Employee's aware of equipment's work area(s)
Heavy Equipment (Endloaders/Forklifts/Bobcats):
-
Daily Inspection
-
Back Up Alarm
-
Qualified Operators
-
Operator's Manual
-
Proper Shut Down and Storage
-
Employee's aware of equipment's work area(s)
Rigging:
-
Nylon Slings (Remove if stitches are ripped, core shows, cuts, etc.)
-
Shackles
-
Wire Rope Slings (Remove if broken wire: 10 in one layer, 5 in 1 strand of a layer, 2 in eye)
-
Spreaders
-
Hooks (Remove if bent, twisted, excessively worn, welded on, pitted)
-
Turnbuckles
-
Other (If "At Risk" put in the notes what type of rigging it is, and why it is at risk)
Personal Protective Equipment (PPE):
-
Hardhats
-
Safety Glasses
-
Gloves
-
Respiratory Protection (if required, must be fit tested)
-
Hearing Protection
-
Safety Vests
-
Face Shields (used for any grinding and chipping activities)
-
Buoyant Work Vest
Hand/Power Tools:
-
Tools used for their intended purpose
-
Guards provided where required
-
Impact tools inspected for mushrooming or cracking
Confined Space/Excavations:
-
Competent Person:
-
Type of Confined Space
-
Gas Detector/Air Monitor
-
Access
-
Retrieval System
-
Training
-
Shoring/Sloping/Benching
Electrical:
-
GFCI/assured grounding/tools grounded
-
Overhead wires?
-
Underground wires?
-
Generator in proper working condition
-
Condition of power tools and cords
-
Generators grounded
Housekeeping and Storage:
-
Trash/debris controlled
-
Material storage
-
Proper containers
Welding and Cutting:
-
Fire Extinguisher
-
Area clear of combustible
-
Proper storage of compressed cylinders
-
Strikers used
-
Hoses/Leads inspected
-
Gauges in working order
Materials Handling:
-
Proper lifting/bending/twisting
-
Mechanical assist or two-man lift when too heavy
-
Hands free of pinch points
Fire Safety:
-
Fire extinguishers in working order
-
Housekeeping-storage
-
Flammable/combustible liquids storage
-
Fire watch
Project Set-Up:
-
Emergency numbers/facilities identified
-
Utilities locate provided
-
Project safety plan completed
-
Site-specific training-OSHA 10/30hr, MSHA 24hr
Other:
-
Safety Manual/MSDS onsite
-
First-aid supplies/eyewash available
-
Weekly TBT- Toolbox talk completed
-
Job Hazard Analysis (JHA)/Daily Task Analysis (DTA)
-
Guards/covers/grates provided for rotating parts
-
Hoses whip-checked/pinned
-
Note any comment, corrective actions or other safety observations:
-
Superintendent's Signature:
-
Safety Representative's Signature