Title Page
JorCo Safety Checklist HAFB POL PROJECT All NO answers require Stop Work and comments with a completion date for corrective action(s).
-
-
Conducted on
-
Prepared by
-
Location
-
1. Conditions have NOT changed since last inspection?
-
2. Risk Assessment is current and signed by all affected employee?
-
3. High Risk Tasks such as Work at Heights are addressed daily and control measures properly initiated?
-
4. PPE available, serviceable and being used properly?
-
Has adequate protection been provided to prevent damage from Foreign Objects (FOD)? From overhead work?
-
7. Ladders if used inspected?
-
8. Material Handling Equipment - Mobile Elevating Platforms (MEWP) inspected and users trained for authorized operation?
-
9. Approved scaffolding inspected by Competent Person and documented?
-
To add items specific to your task/facility select Add
Footer
-
Enter Comments:
-
Upload Photos from your device.