Title Page
-
Site conducted
-
Project
-
Audit date
-
Prepared by
-
JPH site manager
General
-
Tidiness? Score out of 10
-
Operatives in correct, clean workwear
-
Certificates/inspections on all lifting equipment and MEWPS
-
Site correctly segregated
-
Clear signage, inc. contact details for job owner
-
110V distribution present and tidy. No trailing cables.
-
PAT testing in date.
-
Storage areas are safe and tidy (barriered off).
-
Operatives/team leader aware of works.
-
Chemicals present?
-
Are COSHH assessment in place?
-
Correct PPE?
-
Spill containment in place?
-
Risk of taint: smell present outside of work area?
Scaffold
-
Tagged and inspected?
-
Visual inspection: all toe boards in place, no trip hazards, no loose connections
Working at height
-
Harnesses present and being worn/used correctly
-
Rescue plan in place
-
Ladders present?
-
Why?
-
Can these be replaced by scaffold or a platform?
Permit to work
-
Signed by job executor
-
Signed by job owner
-
Signed by area owner
-
Reverse signed by all operatives
-
All sections filled in (inc. tick boxes)
-
Hazards/controls/SSWs all correctly identified
TRA
-
Present and clear
-
Signed by relevant approvers
-
Signed by all operatives
RAMS
-
Method statement clear and safe
-
Signed by all operatives
-
Operatives following RAMS
-
Correct PPE
Hot work
-
Hot work permit present and signed
-
No flammable materials in area
-
Extinguisher (in date, sealed) and water bucket in place
-
Correct PPE
-
Segregation in place to catch swarf etc
-
Gas bottles strapped in place, not stored horizontally
-
Filtered extraction in place
CDM
-
CDM board present and clearly visible
-
F10 notification displayed
-
Construction Phase Plan available
-
Construction Phase Plan up to date
-
Site secure and adequate signage
-
Emergency exits defined with adequate signage and agreed with operations lead for area
-
Site register in use
-
Accurate?
-
CDM inductions up to date
-
Toolbox talks carried out: ask two persons when last talk received
-
Emergency procedures available and displayed
-
Evacuation procedure understood: ask 2 operatives
-
Fire protection adequate
-
Are existing fire protection systems compromised by works?
-
Insurers informed?
-
Operatives have relevant training cards
-
Is waste being handled in accordance with the Site Waste Management Plan (SWMP)?
-
Waste carrier licence and waste disposal certificates available?
-
Traffic management plan in place?
-
Adequate fork lift truck segregation?
-
Contractor vehicles parked properly
-
Vehicle/plant/equipment movements covered by a banksman?
-
Accident report book available or site specific process
-
Contractor own inspection/audit records are available
Additional comments and observations
-
General comments
-
Examples of good practice
-
Examples of bad practice