Information

  • Customer - Jobsite Name:

  • Scope of work to be completed by K&D Construction:

  • Location:
  • Conducted on

  • K & D Onsite Supervisor:

  • Audit Conducted By:

  • Date of last audit - This Job, This Job Site (Location):

1. Administration

  • 1.1. Have employees completed AEP Annual orientation and have hard hat stickers for Documentation?

  • 1.2. Has site Supervision completed OSHA 30 hour training and all additional so completed OSHA 10 Hour training?

  • 1.3 are there at least 2 K&D employees trained in First Aid and CPR?

  • 1.4 Does the contractor have qualified and competent Supervision at the site?

  • 1.5 is the PSSEP readily available and updated as needed

  • 1.6 Are Safety Data Sheets (SDS/MSDS) readily available and employees aware of the technology or the location?

  • 1.7 Are adequate First Aid supplies including eye wash and blood borne pathogen kit available?

  • 1.8 Is there a documented emergency action plan on-site? (Plan includes emergency contacts, maps to the nearest hospital, communication methods and procedures to follow in the event of an emergency.)

  • 1.9 Has the Emergency Action Plan been reviewed by employees and route driven to the hospital?

  • 1.10 Is the K&D Safety Manual readily available?

  • 1.13 Is equipment grounded where needed and maintaining the minimum approach distances?

  • 1.11 Are employees who might be subject to fall hazards trained in fall protection in order to minimize these hazards?

  • 1.12 Other

  • 1.14 Is equipment inspected daily and in satisfactory condition?

  • 1.15 Is a designated spotter in place and safe work distance maintained to structures, equipment,and overhead hazards?

  • 1.16Is the weight of the load verified and equipment/rigging rated for the load?

  • 1.17 Is the load properly secured and equipment in use not left unattended?

  • 1.18 Is the rigging equipment inspected prior to use and protected from sharp edges?

  • 1.19 Are the operators properly trained and deemed competent/qualified to operate equipment?

  • 1.20 Is a fire extinguisher available on all equipment?

  • 1.21 Have employees completed a truck load/unloading checklist for all materials being loaded and unload where equipment or rigging is required to assist in moving the material?

  • 1.22 Are pole handling guidelines Followed?

  • 1.23 OTHER

2. CRANES (Check N/A if none apply to current job)

  • 2.1 Do cranes have a record of annual inspection and pre-use inspection?

  • 2.2 Are all safety devices functioning properly and in use as required? (Anti-two block, load limit charts, boom angle indicator, back up alarm, horn Eric.)

  • 2.3 Do all signalman/riggers have documented training?

  • 2.4 Is the swing radius on equipment is barricaded?

  • 2.5 Is the crane supported and level with outriggers extended and cribbing (3X area of the float?

  • 2.6 Are tag lines in use and employees protected from overhead loads?

  • 2.7 Has a trial lift/proof test been performed prior to use of personnel platforms?

  • 2.8 OTHER

3. EXCAVATIONS

  • 3.1 Has a competent person performed a documented inspection prior to entry for each shift and when conditions change? (Rain, thaw, etc.)

  • 3.2 Have utilities been located and marked?

  • 3.3 Is egress provided within 25' for excavation depths 4' or greater?

  • 3.4 Are employees entering excavations/trenches 5' or greater protected from cave in? (Sloped, shored, or shielded)

  • 3.5. Are spoils and equipment at least 2' from the edge of the excavation?

  • 3.6. Are excavations barricaded when left unattended?

  • 3.7. Are drilled excavations appropriately protected? ( Fall protection, barricades, etc.)

  • 3.8. Is contractor utilizing fall protection at appropriate height? (Harness, lanyard, fall limiters, guard rails, etc.)

  • 3.9. Are open holes properly covered? (Covers capable of supporting 2 times the intended load, labeled "hole" and secured to prevent displacement)

  • 3.10. Does the contractor have a rescue/retrieval plan in place?

  • 3.11 OTHER

4. Hand and Power Tools (Check box if none apply to current job)

  • 4.1 Are hand and power tools in good working condition and free of defects (Broken handles, cracked frames, damaged cords, etc.) with required safety guards in place?

  • 4.2 Are employees using the right tool for the right job? (Meets mfg. intent)

  • 4.3 Are pneumatic hose connections secured with cable restraint devices? (Whip checks)

  • 4.4 Are extension cords in good condition and protected from traffic and damage?

  • 4.5 Is the contractor utilizing and relying on personal GFCI for all cords?

  • 4.6 OTHER

5. HOUSEKEEPING

  • 5.1 Is potable water and adequate toilet and wash facilities available?

  • 5.2 Are form and scrap lumber with protruding nails and other debri kept clear from all work areas?

  • 5.3 Are containers provided for collection of all refuse and waste disposed of at frequent intervals?

  • 5.4 Is spill containment and/or spill kit available?

  • 5.5 Are compressed gas cylinders properly stored? (Upright, secured, valve cap in place)

  • 5.6 Are flammable liquids properly labeled and stored in approved containers?

  • 5.7 Is fire extinguisher within proper distance to flammable storage? (25' to 50')

  • 5.8 Are all fire extinguishers charged and inspected?

  • 5.9 Is fuels storage free of combustible materials with "No Smoking" signs conspicuously posted?

  • 5.10 Has contractor addressed potential slips/trips/falls? (Walk areas clear and free of ruts, snow/ice removal, etc.)

  • 5.11 OTHER

6. LADDERS AND STAIRS

  • 6.1 Is a ladder or stairs provided for access break exceeding 19"?

  • 6.2 Are stairways with 4 or more risers or rising more than 30" equipped with one handrail and 1 stair rail along each unprotected edge/side?

  • 6.3 Are ladders inspected and in good condition and rating labels intact?

  • 6.4 Is step ladder fully open and spreader lock engaged?

  • 6.5 Is extension ladder setup properly? (4:1 pitch extended 3' over landing and secured to prevent displacement)

  • 6.6 OTHER

7. LIVE LINE TOOLSb.

  • 7.1 Are all insulated tools and PPE properly stored?

  • 7.2 Are all insulated tools and PPE visually inspected prior to use and in good condition?

  • 7.3 Are all insulated tools and materials stamped with current dielectric test dates? (Hot sticks-2yrs.,Rubber Gloves-6mo., Sleeves and Blankets-12mo.)

  • 7.4 OTHER

8. PERSONAL PROTECTIVE EQUIPMENT

  • 8.1 Are all employees wearing at a minimum a hard hat, ANSI approved safety glasses w/side shields, safety toed shoes, and a high visibility reflective shirt/vest as the outer most layer?

  • 8.2 Are employees working "on or near" energized lines and equipment wearing appropriate rated FR Clothing? (Minimum of 8cal/cm2 as the outermost layer)

  • 8.3 Are employees wearing gloves appropriate for the hazard? ( Leather, cut resistant, dielectric, etc.

  • 8.4 Are employees exposed to flying particles/chemical splash wearing a face shield? (Cad-welding, grinding, chainsaw, battery handling, etc.)

  • 8.5 Are employees exposed to arc during welding activities wearing a welding hood?

  • 8.6 Is all protruding reinforced steel, onto and into which employees could fall, guarded to eliminate the hazard of impalement?

  • 8.7 Is additional PPE in use as required? (Hearing protection, respirators, metatarsal protection, chaps, etc.)

  • 8.8 Are all employees wearing appropriate fall protection when required?

  • 8.9 OTHER

9. Substation

  • 9.1 Did the contractor report into dispatch?

  • 9.2 Are all employees (including subcontractors) station entry trained or escorted?

  • 9.3 Is substation gate closed and locked or under the observation of an attendant at all times?

  • 9.4 Is substation construction signage posted for hazards? (Under construction, open excavations, etc.)

  • 9.5 Has the contractor received documented approval for excavations and utilizing approved digging methods?

  • 9.6 OTHER

10. TASK HAZARD ANALYSTS

  • 10.1 Has the contractor performed a documented THA that list the step-by-step plan for the task, hazards associated with task and control measures to mitigate hazards?

  • 10.2 Has the contractor conducted a THA review with all visitors and briefed them on scope of work and hazards in the work area?

  • 10.3 Have all employees reviewed and signed the THA prior to work and immediately after lunch and/or significant break?

  • 10.4 Are confined enclosed spaces identified and listed on the THA?

  • 10.5 OTHER

11. WIRE PULLING

  • 11.1 Is Wire Pulling Plan documented, readily available, and updated as needed?

  • 11.2 Are radio communications in use and echo communication protocols being followed?

  • 11.3 Are guard structures erected where needed and energized lines properly protected?

  • 11.4 Is wire pulling/stringing/tensioning equipment barricaded, bonded, and grounded with EPZ mats in place?

  • 11.5 Is equipment rigging inspected and rated for required pull and tension?

  • 11.6 Is a 3:1 distance maintained to first and last structure?

  • 11.7 Are there running grounds on both ends if needed and ground travelers at all hot crossings?

  • 11.8 Is there a person assigned to follow swivel or sock thru structure?

  • 11.9 Have required permits been obtained for any public road crossings?

  • 11.10 OTHER

12. WORKING ON OR NEAR ENERGIZED EQUIPMENT

  • 12.1 Are lines and equipment de-energized, tested, and grounded?

  • 12.2 Are employees maintaining appropriate approach distances?

  • 12.3 Are energized facilities covered or guarded to prevent contact?

  • 12.4 Do the foreman and crew know and understand the clearance points?

  • 12.5 Do the foreman and crew know who holds the clearance, non-recluse order or hold order for the facilities being worked?

  • 12.6 Has the contractor been advised of equipment under an NRO?

  • 12.7 Have all sources of energy been considered including induced voltage?

  • 12.8 Are grounds in good condition with proper clamps tagged with test date not exceeding 2 years.

  • 12.9 OTHER

13. WORK PLATFORMS (Aerial Lifts, Trucks, Crane Baskets, etc.)

  • 13.1 Is the gate or chain secured and nothing used to increased height? ( Working from floor of basket/platform)

  • 13.2 Is equipment adequately grounded and maintaining safe work distances?

  • 13.3 Is personal fall in use and secured to proper for anchorage points?

  • 13.4 Does the operator have training and documented daily inspection?

  • 13.5 Is equipment operated on a level surface loaded properly and within load capacity limits?

  • 13.6 Is Qualified Observer/Spotter utilized to ensure MAD is maintained for tight spaces or when operators view is obstructed?

  • 13.7 Does equipment have current dielectric test?

  • 13.8 OTHER

14. WORK ZONE PROTECTION

  • 14.1 Are workers properly protected from vehicle traffic? (Signs, cones,flagging operations, etc.)

  • 14.2 Are overhead lines marked with signs?

  • 14.3 Does Contractor have a documented traffic control plan in place?

  • 14.4 OTHER

COMMENTS AND SUGGESTIONS

  • COMMENTS:

  • Signature of person receiving audit review:

  • Signature of person completing audit:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.