Title Page
-
Job number
-
Conducted on
-
Prepared by
-
Location
Photos
-
Are the existing footpaths, kerb, driveway or cross-over damaged?
-
Does the road in front or near the site have any stress cracking, gouges or holes?
-
Photos of the Layback, Footpath, Kerb & Guttering
-
Photos of the road area
-
Photos of the existing house
-
Photos of the boundary fence
-
Is there an existing pool?
Site Evaluation
-
Is there available and safe parking for the contractors or delivery vehicles?
-
Is the site within 300 meters of a school or pedestrian crossing?
-
Is traffic control required?
-
Are there any road signs located within the constraints of the site?
-
Will split deliveries be required due to access, storage or traffic issues?
-
Will delivery and work vehicles be able to drive onto the building platform in all weather conditions?
-
Do you foresee any building problems, such as steepness of site, access problems etc.?
-
Is there adequate access and storage area for building materials, rubbish cages and toilet within the boundary (Not on nature strip)
-
Do you foresee any issues with installing normal scaffold for the site size or access restrictions?
-
Will scaffold need shade cloth due to proximity of neighbors boundaries or driveways etc.? If yes, please nominate which sides.
-
Will there be additional edge protection, such as falls from retaining walls or work platforms?
-
Services (Electricity/ Storm water/ Sewer/ Water/ Gas/ Communications)
-
Please specify if Underground or Overhead power?
-
If overhead, will the height or position of power lines pose a risk and affect deliveries to Construction activities ? (e.g. Frame delivery, Crane, Concrete Boom Pump operation)
-
Is water service easily located (location viewed from street)
-
Is there additional assets such as, Gas meter, Communications, Telstra Pits, underground septic, rain water tanks, fire hydrants, sewer pits, storm water pits etc?
-
Can the existing kerb outlet be reused?
Restrictions (Trees/ Earthworks/ Asbestos/ Rock)
-
Are there any trees within the building platform?
-
Are there any trees on common boundaries that may be affected by excavation and filling?
-
Will earthworks impact on neighboring properties? If yes please provide comments.
-
Is there any visible rock onsite? Or adjoining property?
-
Is there any signs of asbestos on this site ? If yes, WHS Manager to be notified and an Asbestos Clearance Certificate is required prior to the construction starting.
-
Any further issue / items that estimating need to be notified?