Title Page
-
Audit Title
-
Client
-
GeoOp job number
-
Conducted on
-
Prepared by
-
Location
ROOF TOP INSPECTION
-
Visually inspected each solar module
-
Wash solar array thoroughly
-
Check mounting hardware is still secure
-
Check external wiring supports
-
Check the integrity of the earthing system
-
Check DC isolators for water ingress
-
Check DC isolators for correct operation
-
Check all connectors are engaged correctly
-
Check labelling is still legible and correct
GROUND LEVEL INSPECTION
-
Inverter has been cleaned
-
Inverter screen is still legible
-
Check electrical wiring supports are still secure and intact
-
Check operation of DC isolators
-
Check connectors are engaged properly
ANTI ISLANDING TEST
-
How long does the Inverter take to disconnect ( < 2sec)
-
How long does the Inverter take to reconnect ( > 60sec)
-
Does the system pass the Anti Islanding test
SYSTEM TEST
-
String Test Results
String
-
String polarity
-
Irradiance at time of testing
-
String measured Voc
-
String measured Isc
-
String 1 Vmp
-
String 1 Imp
-
Inverters Yearly Production Output
-
Inverters Lifetime Output
REPORT ANALYSIS
-
Repairs urgently needed
-
Repairs suggested
-
Overall comments on system service
-
Technician signature