Title Page

  • Conducted on

  • Prepared by

  • Location
  • Substation Exterior Photo

  • Wind Farm Present Output in MW

  • Weather During Inspection

  • Temperature at Start of Inspection in Celcius

  • Main Gate Closed and Locked

  • Fence Condition in Entire condition

  • Fence Grounds connected and in GOOD Condition

  • Clear of Erosion along fence perimeter

  • 89-LK1 Main Disconnect Pole

  • 89-LK1 - Pole, Structure and Supports in Good Condition

  • 89-LK1 - Insulators in Good Condition

  • 89 LK1- Motorized Switch Assembly in GOOD Condition and Attached with PIN

  • 89 LK1- Switch Box Closed and Locked

  • 89 LK1- Grounds and Matt at Base of Pole

  • 89-LM1 Main Disconnect Pole

  • 89 LM1- Pole, Structure and Supports in GOOD Condition

  • 89 LM1- Insulators in Good Condition

  • 89 LM1- Motorized Switch Assembly in Good Condition with PIN attached

  • 89 LM1- Switch Enclosed Closed and Locked

  • 89 LM1- Grounds and Matt at Base of Pole

  • Kent Pad Mount at Metering Enclosure- Good Condition

  • Kent Pad Mount at Metering Enclosure- Access Door Closed and Locked

  • Kent Pad Mount at Metering Enclosure- Bollard in Good Condition

  • Macleod Pad Mount Metering Enclosure- Overall Condition GOOD

  • Kent Pad Mount at Metering Enclosure- Clear of Any OIL leaks

  • Macleod Pad Mount Metering Enclosure- Access Doors Closed and Locked

  • Macleod Pad Mount Metering Enclosure- Bollard in GOOD Condition

  • SG-K1 Pad Mount Vista Switch- Clear of any erosion around Perimeter

  • SG-M1 Pad Mount Vista Switch-Enclosure Closed and Locked

  • SG-K1 Pad Mount Vista Switch- Ground in Good Condition

  • SG-K1 Pad Mount Vista Switch- Bollard in GOOD Condition

  • SG-M1 Pad Mount Vista Switch-Ground in GOOD Condition

  • SG-M1 Pad Mount Vista Switch- Bollard in GOOD Condition

  • JB-K2 Junction Box- Enclosure Closed and Locked

  • JB-K2 Junction Box- Clear of any Erosion around Perimeter

  • JB-K2 Junction Box- Bollard in GOOD Condition

  • JB-M1 Junction Box- Enclose Closed and Locked

  • JB-M1 Junction Box- Clear of any Erosion around perimeter

  • JB-M1 Junction Box-Ground in GOOD Condition

  • JB-M1 Junction Box- Bollard in GOOD Condition

  • JB-M4 Junction Box- Enclose Closed and Locked

  • JB-M4 Junction Box- Clear of any Erosion around perimeter

  • JB-M4 Junction Box- Ground in GOOD Condition

  • JB-M4 Junction Box-Bollard in Good Condition

  • JB-M4 Junction Box- Clear of any Erosion around perimeter

  • E-House Control Room- Access Doors Closed and Locked

  • E-House Control Room- Exterior of Building- Clear with No Damage

  • E-House Control Room-Clear of Erosion around perimeter

  • E-House Control Room-Grounds in GOOD Condition

  • E-House Control Room- GFCI Receptacles in working Condition

  • E-House Control Room- Interior of Building in GOOD Condition

  • E-House Control Room-Heating/Cooling Systems Working

  • E-House Control Room-First Aid Kit Available

  • E-House Control Room-Fire Extinguishers Checked

  • E-House Control Room-Emergency Lightening TESTED and passed on Batteries

  • E-House Control Room- Fire Shield Panel is Alarm Free and Operational

  • E-House Control Room- Clear of Any Burnt Smells

  • E-House Control Room- Clear of ANY Relay Alarms

  • E-House Control Room- Eye wash Station Check for Expiration and is Full near Kent and Macloed Battery Charging Station

  • E-House Control Room- Clear of Any Control Relay Alarms

  • Kent Schweitzer Panel

  • Macloed Schweitzer Panel

  • Kent Battery Charging Voltage

  • Kent Battery Voltage- Battery 1

  • Kent Battery Voltage- Battery 2

  • Kent Battery Voltage- Battery 3

  • Kent Battery Voltage-Battery 4

  • Kent Battery Voltage-Battery 5

  • Kent Battery Voltage- Battery 6

  • Kent Battery Voltage- Battery 7

  • Kent Battery Voltage- Battery 8

  • Kent Battery Voltage- Battery 9

  • Kent Battery Voltage- Battery 10

  • Macloed Battery Charging Voltage

  • Macloed Battery Voltage- Battery 1

  • Macloed Battery Voltage- Battery 2

  • Macloed Battery Voltage- Battery 3

  • Macloed Battery Voltage- Battery 4

  • Macloed Battery Voltage- Battery 5

  • Macloed Battery Voltage- Battery 6

  • Macloed Battery Voltage- Battery 7

  • Macloed Battery Voltage- Battery 8

  • Macloed Battery Voltage- Battery 9

  • Macloed Battery Voltage- Battery 10

  • Select date

  • Add signature

  • Scada Main Panel

  • Scada UPS

  • Fire Shield Panel

  • Eyewash Station

  • Metering Enclosure Boxes

  • Substation PPE

  • Interior - Control Room

  • Interior - Breaker Area

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.